Forum quick links
LEED Project Boundary - LEED NCv2.2
posted by Jennifer Turchin on
We have a hotel project that is 23 stories and was started and registered as a LEED NCv2.2 project in 2008.
Blower door test form
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Stefania Minotti on
Hi, does anyone know where I can find the ‘’Certificate of Field Verification and Diagnostic Testing’’ that needs to be filled out for each blower door test that is performed, as indicated in ‘’4
Exterior Lighting - LPD
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Simon Sue on
We have a retail banking project. the building is 2 stories high + a roof top and was renovated. We installed a roof garden on it. we also install light fixture surrounding the roof garden.
Existing shower facilities used for previous LEED certification
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Sharlene Angeles on
Our project site has a sufficient changing/shower facility that is existing in another building that also achieved LEED certification, including this point.
EBOM IEQp1: Dedicated OA to classroom FCU's
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by James Doyle on
For EBOM IEQp1 we have a school using a dedicated ventilation AHU providing ventilation air to classroom FCU's.
LEED for Homes overseas!
posted by Maged Samy on
i have a client who is intrested in LEED home for his Signle Family development, about 300 signle family home, in Saudi Arabia any experiance, to share...
Cooling Tower for Back-up Diesel Generators (DG)
EBOM-2009 WEc4:Cooling tower water managementposted by Anshul Chawla on
The project site has 3 cooling towers of 215 ton capacity each. These cooling towers serve the HVAC system of the building and are operational for 8-10 hrs on all working days.
VRP Compliance Calculator
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Juliana Malho on
We have a CI project with multiple zone units and VAV system. We are using template VRP compliance calculator.
Technical Rooms
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Juliana Malho on
Does technical rooms, as IDFs rooms needs to have outside air renovation?
Advice on acceptable approach to credit achievement for IEQc5
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Shelley Duan on
Is a covered exterior grate system (e.g, outside a vestibule) at all high volume entryways an acceptable approach to credit achievement for IEQc5? Any advice or guidance would be most appreciated.