Post-review changes to the performance period

Performance Period
posted by  Melissa Young  on 

We submitted our preliminary application for LEED 2009 EBOM and received a whole list of credits that were approved and pending.

2
Default Avatar
Principal ESD Consultant/Architect
GreenArc Sustainable Building & Architecture
LEEDuser Basic Member
170 thumbs up
Wed May 11, 2011, 4:36 pm

Retaining rainwater for future uses

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Gabriela Hernández Castillo  on 

Will capturing all rainwater and keep it in a tank for future uses such as cooling towers and irrigation? Our project will not infiltrate it but reuse it instead.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed May 11, 2011, 4:30 pm
4
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Wed May 11, 2011, 1:58 pm

specific mechanical drawings for PI4?

General forums
posted by  Erica Downs  on 

Does anyone know specifically which "mechanical" drawings GBCI is looking for here? We have 26 drawings just for mechanical (not including electrical or plumbing).

5
Wed May 11, 2011, 1:12 pm

Remnant Limestone- any LEED credit there?

CS-2009 MRc3:Materials Reuse
posted by  Julie Hendricks  on 

My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Tue May 10, 2011, 1:29 pm

Occupancy Sensor

CI-2009 EAp2:Minimum Energy Performance
posted by  Simon Sue  on 

We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors).

3
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Tue May 10, 2011, 12:23 pm
5
Tue May 10, 2011, 11:51 am

EAPr2 - Lighting Control (shut-off control and space control)

CI-2009 EAp2:Minimum Energy Performance
posted by  Ramesh Narayanan  on 

Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory p

2
Energy Engineer
CLEAResult Consulting
LEEDuser Basic Member
222 thumbs up
Tue May 10, 2011, 7:12 am
4
Default Avatar
Project Manager
KGO Consultants
LEEDuser Basic Member
19 thumbs up
Fri May 6, 2011, 6:10 pm

Interpretation table 5.5-4 ASHRAE 2007 mandatory provisions

NC-2009 EAp2:Minimum Energy Performance
posted by  Vindio Corro  on 

We are preparing the LEEd for a Stadium in Spain and I have a doubt with the conditioned areas. The level -2 is conditioned and the level -1 (parking) is unconditioned...which is the U-factor we ha

4
Default Avatar
Master Degree Construction Engineering
Anomalia
LEEDuser Basic Member
11 thumbs up
Fri May 6, 2011, 1:35 pm