Forum quick links
Sealant for Joints
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Maya Karkour on
Hi, I am was wondering if the sealants for concrete joints (slab on grade) at a basement level, must comply with the requirements.
MR c3.2 Materials Reuse - Furniture & furniture
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Pamela Branch on
My client is a small non-profit, and on a shoe string budget. They are using used or donated furniture for 100% of their Furniture/Furnishings.
LEED for District Cooling Plant
posted by Banafsheh Shobeiri on
We are working on a DCP with associated parking space and a minor office space. Is LEED NC appropriate for this utility building?
Part II AGMBC timeline
posted by Melissa Merryweather on
Glad to finally get the partial update to Part II. Frustrated to see that the on-line advice on fees still relates to Part I, nothing on Part II yet.
IEQp1 compliance for high-rise with 1 outdoor air intake
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dawn Brenner on
The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007.
SSc2 Option2
CI-2009 SSc2:Development Density and Community Connectivityposted by Holly Himes on
Does the entire residential area within the 1/2 mile radius need to be 10 units per acre or more or just a selection of higher density housing choices within the 1/2 mile radius?
Documenting the credit...
CI-2009 SSc2:Development Density and Community Connectivityposted by Jennifer Berthelot-Jelovic on
I am currently submitting for a LEED CI v3.0 project and need to document the Development Density. I have no issues with Community Connectivity.
Vacancy - EQp1 Calculations
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alice Cook on
We have a floor that is vacant in our project building.
Measure AHUs or measure air flow in each room?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Michelle Perez on
Hello, We are currently working on a LEED EBOM project at our University campus.