Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Duration in lavatory faucets – 15 or 30 seconds?

CS-2009 WEp1:Water Use Reduction
posted by  Maria Porter  on 

On LEED Online and in the Reference Guide one use of a lavatory faucet is 15 seconds.

2
Default Avatar
Design/LEED Specialist
The Neenan Company
LEEDuser Basic Member
133 thumbs up
Fri Jan 13, 2012, 9:19 am

Commissioning Authority (CxA) Regional experience?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Ameet AA  on 

LEED user guide states that the CxA must have Documented commissioning authority experience in at least 2 building projects. 1) 2 Building project could be from any region?

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Thu Jan 12, 2012, 2:12 pm
5
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Thu Jan 12, 2012, 3:12 am

Air Extraction System

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Luis Miguel Diazgranados  on 

We are working on a natural ventilated CS office building. The entire building is going to be natural ventilated with no AC.

3
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Wed Jan 11, 2012, 4:43 pm

EA Pre-requ. #1

posted by  Jason Dohl  on 
4
CLI Group, LLC
LEEDuser Basic Member
11 thumbs up
Wed Jan 11, 2012, 10:48 am

Where to upload responses to Preliminary Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Liz Valdez  on 

My project has gone through the preliminary review. We had a number of questions related to EAp2.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Wed Jan 11, 2012, 1:25 am

we have a training ceter

General forums
posted by  ola shunnar  on 

we have a training ceter building and would like to register it under the CI, and my question is on the MPR, form 2: there is two phrases in the form that make me confused, which are the a) Project

8
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Jan 10, 2012, 10:19 pm

Calculating when only a certain % of male RR's have urinals.

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rand Ekman  on 

While the Water Use Reduction Additional Guidance document, (updated August 16, 2010), clearly address’ how to calculate total daily uses both with and without urinals.

4
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Tue Jan 10, 2012, 9:43 pm

WeP1 for LEED CI

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Linda Delair  on 

I have a cut sheet on a faucet the building owners want to use in the public lavatories in their 3,5000 sq. ft.dental building. They and their staff are the only tenants.

2
Default Avatar
Mechanical Engineer
Mazzetti Nash Lipsey Burch
LEEDuser Basic Member
6 thumbs up
Tue Jan 10, 2012, 9:36 pm

NEMA compliance

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Blas Beristain  on 

Hi. I am kind of new to this. I was checking if a Spanish building might earn some credits from MRc4.

2
Tue Jan 10, 2012, 6:40 pm