Forum quick links
Duration in lavatory faucets – 15 or 30 seconds?
CS-2009 WEp1:Water Use Reductionposted by Maria Porter on
On LEED Online and in the Reference Guide one use of a lavatory faucet is 15 seconds.
Commissioning Authority (CxA) Regional experience?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ameet AA on
LEED user guide states that the CxA must have Documented commissioning authority experience in at least 2 building projects. 1) 2 Building project could be from any region?
Air Extraction System
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
We are working on a natural ventilated CS office building. The entire building is going to be natural ventilated with no AC.
Where to upload responses to Preliminary Review
posted by Liz Valdez on
My project has gone through the preliminary review. We had a number of questions related to EAp2.
we have a training ceter
posted by ola shunnar on
we have a training ceter building and would like to register it under the CI, and my question is on the MPR, form 2: there is two phrases in the form that make me confused, which are the a) Project
Calculating when only a certain % of male RR's have urinals.
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rand Ekman on
While the Water Use Reduction Additional Guidance document, (updated August 16, 2010), clearly address’ how to calculate total daily uses both with and without urinals.
WeP1 for LEED CI
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Linda Delair on
I have a cut sheet on a faucet the building owners want to use in the public lavatories in their 3,5000 sq. ft.dental building. They and their staff are the only tenants.
NEMA compliance
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Blas Beristain on
Hi. I am kind of new to this. I was checking if a Spanish building might earn some credits from MRc4.