Site contamination

Schools-2009 SSp2:Environmental Site Assessment
posted by  Carol Vick  on 

I have a LEED for Schools project where we have site contamination from an old gas station leaky storage tank.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Feb 18, 2012, 3:17 am

MERV 13 filters on fan coil units

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  james moler, p.e.  on 

Numerous CIR responses and LEED Interpretations previously denied the credit where fan coil units recirculating room air for supplemental cooling in high load spaces were equipped with MERV 8 filte

4
Sat Feb 18, 2012, 1:08 am

non-finished flooring for C&S

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Natalie Ng  on 

the project is an office building development, the project proponent would like to leave the feasiblity of installing carpet to the tenants thus the floor will be concrete finish with raised floor

7
Default Avatar
Owner
Gaia Development
LEEDuser Basic Member
5 thumbs up
Sat Feb 18, 2012, 12:12 am

Babies - Water Consumption

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Adriana Hansen  on 

I'm working on a preschool project, which will have 30 babies between 4 months to 1 year-old; 30 babies between 1 to 2 years-old; 30 babies between 2 - 3 years-old; and 30 babies between 3 to 4 yea

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Fri Feb 17, 2012, 7:38 pm

Rubber Walk-Off Mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Dave Wortman  on 

We are contemplating the use of a rubber walk-off mat for a high traffic area at a winter resort with lots of snow.

3
Fri Feb 17, 2012, 6:37 pm

Energy Efficiency Verification (EEV) vs Energy Star

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Monika Mickute  on 

Hi, We purchased a Kenmore Refrigerator for our new office, which is pursuing LEED CI, and instead of it having an Energy Star sticker, it says it is EEV Rated.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 17, 2012, 6:23 pm

New PI Form 2 Version 4.0

General forums
posted by  Ross Spiegel  on 

I am working with the latest version of PI Form 2 on a project and it includes several new lines to complete.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Feb 17, 2012, 5:33 pm

Appeal Process - Submitting all credits at once ?

LEED for Homes (LEED-H) Forum
posted by  Maya Karkour  on 

Dear all, Do any of you know if we are supposed to submit all the appeals at once ? or can we submit them gradually ? Thank you for your help,

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 17, 2012, 4:32 pm

FSC and New Wood in LEED for Homes

LEED for Homes (LEED-H) Forum
posted by  Judy Landwehr  on 

Regarding FSC certified wood-Is the calculation in LEED for Homes the same as in LEED NC as it pertains to only allowing "new wood" and if so, where is this referenced.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Feb 17, 2012, 4:30 pm

Minimum Thresholds for Landscape Credits

LEED for Homes (LEED-H) Forum
posted by  Sam Watters   on 

My project is pursuing LEED for Homes: Multifamily Midrise, and I'm, wondering if it has enough landscaped area to qualify for some of the water efficiency and other landscaping credits. The build

3
Default Avatar
Associate Consultant
UHG Consulting
LEEDuser Basic Member
32 thumbs up
Fri Feb 17, 2012, 3:55 pm