Forum quick links
leedonline offline?
posted by Caroline O'Leary on
control of PIU fans for System 8
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Shall the PIU fans of System 8 cycle according to paragraph G3.1.2.4?
Energy Modeling
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SAMY Chamy on
Dear All:- How to do energy modeling for LEED CI In LEED CI the energy saving is compared for Space heating and Cooling only, 1.Am I Correct 2.Can we consider different Building envelope for Bo
Service water heating for electric water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello everyone, 1. Do the insulation requeriment of service water heating pipes (section 7.4.3 and table 6.8.3) apply for any material?
Waste Material reused "on-site"
NC-2009 MRc2:Construction Waste Managementposted by Adrian Arenas on
Construction Waste Management- Regarding waste material reused on site, our project is currently reusing wood and concrete on site.
Data loggers
EBOM-v4 EQc3:Thermal comfortposted by Patricia Andrasik on
How would one install data loggers to track thermal comfort in a dormitory?
Existing or new building threshold
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
There is a project which includes the renovation of an existing 40 ft high warehouse. The existing structure has only one (ground) floor of 30,000 sf.
Taking credit for DCV in car parks
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Hello Marcus Sheffer, Refering to the LEED Interpretation 10371 related to taking credit for DCV in car parks, it is specified: 1) that the proposed case should be modeled such as that a minimum
U-Value / F-Factor
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Hi, I have calculated the U-Value of a Slab on Grade Floor to be 0.12 (metric) using 100mm insulation.
Data Center - ASHRAE LPD
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- we are doing LEED NC project for data center which one is correct base case LPD for data center in building area method which lighting categories we take if we go with space by space m