LEED Form for Natural Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Erica Downs on
Does anyone have an example of a LEED Form completed for natural ventilation they would be willing to share? There does not appear to be one in the "documentation toolkit".
G3.1.1. Additional system types for nonpredominant conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
We’ve got a comment for a hotel project that “secondary HVAC systems should be specified in the Baseline building if any of the exception(s) from G3.1.1 are applicable.
FloorScore credit on wall applications
NC-v4 EQc2:Low emitting materialsposted by Rick Farrell on
If a FloorScore certified product, specifically a pre-finished engineered wood floor, is applied to a wall or ceiling application does the product contribute to the EQc2 credit in LEED v.4?
Major Renovation scope of work
posted by Vanessa Poirier on
Hi, We are starting a study to verify if a specific renovation project could achieve a LEED V4 BD+C certification. What is the scope of work required to qualify as 'Major Renovation'.
Covered bicycle racks for dormitories building in a university
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by soha yamani on
I am working on a university campus project which includes over twelve buildings and a dormitories building, now regarding SSC4.2 credit we have provided the required number of bicycle racks for ea
Motorcycle Parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Michelle Rosenberger on
Hi Allison, I wanted to add this to the Low E Vehicle Parking thread but could only start a new thread. We have a building with 310 parking spaces. 5 of which are for motorcycles.
Interchangeability of LE/FE vehicles and HOV parking spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Karl Heitman on
We are pursuing both SS4.3 and SS4.4. As long as we provide the total parking spaces required for both 4.3 AND 4.4, can those spaces be used interchangeably for either LE/FE and HOV?
Trees replanted
NC-2009 MRc3:Materials Reuseposted by Noriko Nagazumi on
The reference guide says that section 32 90 00 (Planting/Landscaping materials) must be included in the calculations. We are working on a park that is using trees replanted from neighbor sites.
Help me plead my client's case!
posted by Cynthia Kaplan on
Mid Review Clarification
posted by Deborah Lucking on
Having been the fortunate beneficiary of mid-review clarifications, I'm curious as to the circumstances that would trigger such a request by the Review Team.