Forum quick links
CBECS Data for electric only building
CI-v4 EAc6:Green power and carbon offsetsposted by Travis Gray on
For an office project we are working on, the tenant is only responsible for their electric consumption and will not have any other fuel source dedicated for them.
Hotel
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Ralf Lehmann on
Do I have to conduct the survey in a hotel for all guests or only for employees?
dedicated load from a central plant
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Bethany Beers on
Hello, We were previously unable to achieve this credit for a project receiving chilled water from a campus central plant employing 4 electric centrifugal chillers and 3 heat recovery chillers.
Compact Car Spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Allen Cornett on
I have a project that some of the parking spaces that are the shortest distance to the elevator bank are spaces for compact cars.
LEED NC for Most of a Building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Nathan Gauthier on
Does anybody have any thoughts on certifying an existing building undergoing a major renovation as LEED NC but excluding a relatively small portion of support space that is managed by a different e
LEED 2009 CS Appendix 4
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Mark Mechling on
Hello, Does anyone know where I can find a template for the Tenant Lease or Sales Agreement discussed in LEED 2009 CS Appendix 4? Thank you Mark
Climate Zone for Morocco
NC-v4 EAp2:Minimum energy performanceposted by Jean-Baptiste SARFATI on
Hi, I'm working on a pre-assessment for a project in Morocco and would like to see the minimum wall insulation. I checked in ASHRAE 90.1-2010 but Morocco is not listed in Table B3 International Cl
Suitable Software
CS-v4 IPc1:Integrative processposted by Ciaran McCabe on
Has anyone any advice in terms of suitable software that produces outputs files that meet this credit criteria.
Energy Simulation Baseline
CS-2009 EAc1:Optimize Energy Performanceposted by Yong Lee Low on
Hi, I am working on a office building of about 15,000sqm using AHU with underfloor system.
Baseline Chiller plant - System7
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Could you please provide some advice to the following case (the building belongs to System 7): 1.