Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Building Flush Out Inquiry

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Sheena Moses  on 

We are currently working on an EBOM Retail project which is undergoing fit out works to the common mall and tenant areas.

1
Tue Aug 29, 2017, 4:01 pm

Wash Bay Water Use

NC-v4 WEc2:Indoor water use reduction
posted by  caroline schroeder  on 

The building that I am currently working on features a single wash bay for large service trucks. I am wondering how this will effect my indoor water use.

1
Mon Dec 4, 2017, 5:09 pm

LEED Form MR 4

NC-2009 MRc4:Recycled Content
posted by  juan pena  on 

The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?

1
Sat Aug 26, 2017, 5:34 pm

Geothermal energy loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Tim Murray  on 

We are designing a classroom building on a university campus that will house a geothermal energy substation in its basement.

1
Fri Aug 25, 2017, 7:51 pm

International Project - Case 2 Option 1 or Option 2

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Sheena Moses  on 

Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating.

1
Tue Aug 29, 2017, 3:32 pm

Ceiling Step Down

NC-v4 EQc8:Quality views
posted by  Kim Lombard  on 

Does anyone have a good sense of how to treat step down ceiling heights in calculating the interior distance qualifying for quality views?

1
Mon Aug 28, 2017, 11:25 am

Undisturbed site areas within LEED project boundary?

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Edgar Arevalo  on 

I have a project where a patch of forestry has been removed for a new university building.

1
Mon Aug 28, 2017, 1:30 pm

Can general Contractor act as LEED Project Adminstrator?

General forums
posted by  Ammar Yahia  on 

Is it possible for the general contractor to act as LEED Project administrator, the case we have here as the consultant in that Design-bid -Build Contract, is that ministry (owner) has assigned LEE

1
Sun Aug 27, 2017, 2:08 am

Report Contents

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Omar Elrawy  on 

Concerning Upload IEQp2-5, it is required to upload a differential air pressure test report for each designated smoking room.

0