Forum quick links
Water heat pump
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Instra Ingenieros on
Hi, We received the design and construction review, and the reviewer indicate us that two units that's appear on the prerrequisite EAp3 documentation are not included.
Re. Thermal Comfort for Heated only spaces
NC-2009 IEQc7.1:Thermal Comfort—Designposted by VIGNESH KUMAR M G on
Hello, we have a project where the spaces are naturally ventilated and heated by radiators.may i know whether i should comply under Optional method for naturally conditioned spaces.
Changed awarded credit to attempted
posted by Prudhvi Mahadev on
I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?
Wood Framed Attic and Roof
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Paul Silverberg on
Our project was the complete renovation of a small building with masonry exterior walls, a concrete slab on grade at the first floor and wood framing for the interior walls, 2nd floor, attic and ro
Elevator lobbies -with airlocks?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.
Fire Suppression water count as a candidate for Submetering?
CS-v4 WEc4:Water meteringposted by Jennifer Turchin on
Can a fire suppression water line be one of the sub metered uses to meet the intent of this credit?
Option 3 Strategy '4'
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
For this strategy - if the take back / recycling system costs money (i.e. carpet recycling) does it still count as a strategy?
Private shuttle buses
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Hanh Truong on
Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b
CI clarification
CI-2009 MPR1:Must comply with environmental lawsposted by Hariraman R on
If i want to Certify a portion of a building ?? shall i go for LEED CI ??
air-side economizer, how to input in calculator
NC-2009 IEQp1:Minimum IAQ Performanceposted by Courtney Royal on
Our project is a one floor (on the 30th) LEED-CI project gut renovation project.