Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Water heat pump

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Instra Ingenieros  on 

Hi, We received the design and construction review, and the reviewer indicate us that two units that's appear on the prerrequisite EAp3 documentation are not included.

1
Mon Aug 28, 2017, 6:58 pm

Re. Thermal Comfort for Heated only spaces

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  VIGNESH KUMAR M G  on 

Hello, we have a project where the spaces are naturally ventilated and heated by radiators.may i know whether i should comply under Optional method for naturally conditioned spaces.

1
Thu Aug 31, 2017, 5:11 pm

Changed awarded credit to attempted

LEED Rating System Selection
posted by  Prudhvi Mahadev  on 

I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?

1
Sat Aug 26, 2017, 7:42 pm

Wood Framed Attic and Roof

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Paul Silverberg  on 

Our project was the complete renovation of a small building with masonry exterior walls, a concrete slab on grade at the first floor and wood framing for the interior walls, 2nd floor, attic and ro

1
Sat Aug 26, 2017, 10:06 pm

Elevator lobbies -with airlocks?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Florian Schmidtchen  on 

Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.

0

Fire Suppression water count as a candidate for Submetering?

CS-v4 WEc4:Water metering
posted by  Jennifer Turchin  on 

Can a fire suppression water line be one of the sub metered uses to meet the intent of this credit?

1
Fri Sep 1, 2017, 7:11 pm

Option 3 Strategy '4'

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Gail Napell  on 

For this strategy - if the take back / recycling system costs money (i.e. carpet recycling) does it still count as a strategy?

1
Sat Aug 26, 2017, 7:39 pm

Private shuttle buses

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Hanh Truong  on 

Dear all, I would like to use LI ID# 100001163 : "Shuttle buses should provide direct access to transit facilities within 2 miles of the project site, approximately a 5-10 minute drive, and must b

1
Thu Aug 10, 2017, 12:08 pm

CI clarification

CI-2009 MPR1:Must comply with environmental laws
posted by  Hariraman R  on 

If i want to Certify a portion of a building ?? shall i go for LEED CI ??

0

air-side economizer, how to input in calculator

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Courtney Royal  on 

Our project is a one floor (on the 30th) LEED-CI project gut renovation project.

1
Thu Aug 10, 2017, 10:42 am