project with complete demolition of the old building.
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Qian Tang on
Dear all, we have a project with a complete demolition of an old building on the project site then ditching for the new foundation. We are not sure if this credit is relevant to the demolition pr
Connected underground car parks
NC-v4 LTc7:Reduced parking footprintposted by Florian Schmidtchen on
Dear all. We are working on a LEED v4 NC campus project in which two (office) buildings pursuing a LEED certification.
Toilet Building meet MPR?
NC-v4 MPR3:Must comply with project size requirementsposted by Harry Flamm on
Does a stand-alone one-story building, of 1,600 sf, that contains just public toilets and sinks in a park setting, and no full-time occupancy, meet minimum program requirements for LEED v4 New Cons
Electronic equipment
CI-2009 MRc2:Construction Waste Managementposted by Agnieszka Rylska on
Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the
MRc4 Recycled Content Calculation
NC-2009 MRc4:Recycled Contentposted by Jack Jennings on
Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?
Concrete Regional and Recyle Content
NC-2009 MRc5:Regional Materialsposted by Rick Alfandre on
I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th
About Existing Building for Retail
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Esteban Martinez on
Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.
Belated Project Registration / Certification Process Feedback
posted by Daniela Mendez on
Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City.
Temporary potable connection to a permanent irrigation system
Schools-2009 WEc1:Water Efficient Landscapingposted by Bradley Smith on
I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.
Tab 6-1 and 6-4
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Art classrooms are considered both in Tab. 6-1 and in Tab. 6-4. If we respect Tab. 6-4, could we avoid the verification of Tab. 6-1 (i.e. could we avoid the outdoor air supply)?