Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

project with complete demolition of the old building.

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Qian Tang  on 

Dear all, we have a project with a complete demolition of an old building on the project site then ditching for the new foundation. We are not sure if this credit is relevant to the demolition pr

1
Sat Aug 26, 2017, 8:54 pm

Connected underground car parks

NC-v4 LTc7:Reduced parking footprint
posted by  Florian Schmidtchen  on 

Dear all. We are working on a LEED v4 NC campus project in which two (office) buildings pursuing a LEED certification.

1
Sat Aug 26, 2017, 12:55 pm

Toilet Building meet MPR?

NC-v4 MPR3:Must comply with project size requirements
posted by  Harry Flamm  on 

Does a stand-alone one-story building, of 1,600 sf, that contains just public toilets and sinks in a park setting, and no full-time occupancy, meet minimum program requirements for LEED v4 New Cons

1
Wed Apr 5, 2017, 4:31 pm

Electronic equipment

CI-2009 MRc2:Construction Waste Management
posted by  Agnieszka Rylska  on 

Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the

1
Wed Apr 5, 2017, 3:21 pm

MRc4 Recycled Content Calculation

NC-2009 MRc4:Recycled Content
posted by  Jack Jennings  on 

Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?

1
Fri Apr 7, 2017, 1:08 am

Concrete Regional and Recyle Content

NC-2009 MRc5:Regional Materials
posted by  Rick Alfandre  on 

I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th

1
Thu Jun 15, 2017, 3:24 pm

About Existing Building for Retail

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Esteban Martinez  on 

Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.

1
Thu Aug 31, 2017, 11:44 pm

Belated Project Registration / Certification Process Feedback

General forums
posted by  Daniela Mendez  on 

Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City.

1
Wed Apr 5, 2017, 8:41 pm

Temporary potable connection to a permanent irrigation system

Schools-2009 WEc1:Water Efficient Landscaping
posted by  Bradley Smith  on 

I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.

1
Sun Aug 27, 2017, 12:48 am

Tab 6-1 and 6-4

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

Art classrooms are considered both in Tab. 6-1 and in Tab. 6-4. If we respect Tab. 6-4, could we avoid the verification of Tab. 6-1 (i.e. could we avoid the outdoor air supply)?

1
Thu Apr 20, 2017, 3:37 pm