Forum quick links
Daylight and quality views measurement in a special building
EBOM-v4 EQc5:Daylight and quality viewsposted by Ana Villarroya on
We're working on a case of a building complex that aims to achieve a LEED certification within some years. The complex is a sanctuary, and it includes several hospitality buildings and a shrine.
ASHRAE 62.1 Vs UK's Building Regs Part F
CS-v4 EQp1:Minimum indoor air quality performanceposted by Fleur Baguley on
Hi, I'm assessing a building in the UK. I note a paragraph under the credit for 'Minimum Indoor Air Quality Performance' for using other, more stringent local codes in relation to ventilation.
77 Olfactory Comfort
posted by Carina Clark on
If a commercial project is looking to provide a kitchen/break room, some options include a separation by negative pressurization and hallways.
Section 1504.4 doesn't exist
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone tried to read "Section 1504.4 of the 2009 International Residential Code". This section doesn't exist, and Section 1504 deals with microwaves oven.
Construction waste diversion from the site
CI-v4 MRc6:Construction and demolition waste managementposted by Tracy Backus on
How would packaging, for furniture, be included in this conversation?
SSc4 Option 5 Delivery Service
Retail-NC-v2009 SSc4:Alternative transportationposted by Brian Coffman on
Regarding SSc4 Option 5 Delivery Service. The client/owner is a department store chain which has a main website that offers shipping for online purchases.
Existing Site Conditions altered w/in project boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jim Pugh on
All, We submitted a dormitory project for a university in which there was a very substantial amount of existing parking between our new building and another part of our project (a new, relatively
Material & Recycled Calculator - v2009
NC-2009 MRc5:Regional Materialsposted by Denise Domino on
Can a reviewer tell me how they would like to see this spreadsheet set up? I started with entering as I got the information and then quickly realized when I needed to add another Vendor to the pro
Notes under table in LEED credit form
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Patryk Marciniszyn on
Hi all, under the table in LEED credit form there is a note: Average refrigerant impact per kW must be less than or equal to 13 for 2 points. Does it mean that I won't get 2 points for having av
Medical Equipment Specification
Healthcare-v4 WEp2:Indoor water use reductionposted by Gabriela Crespo on
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.