Forum quick links
about flooring grout category in low-emitting materials
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Leslie Synnestvedt on
I am working on the low-emitting materials calculator and looking at the flooring system right now. I am a bit confused about the category that flooring grout falls into. For Option 1.
No UF
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Charalampos Giannikopoulos on
Is the expression that a product contains "no UF" exactly the same as "no added UF"? In other words would omitting "added" impact on a products' declaration for compliance for IEQc4.4?
Where did the PIF forms go?
NC-v4 MPR3:Must comply with project size requirementsposted by Deborah Lucking on
Most of the information that used to be required by LEED 2009 for PIFs 1 through 4, are now consolidated into the one single Project Information Form in v4.
Hand Hygiene - Towel Dispensers
EBOM-2009 IEQp3:Green Cleaning Policyposted by Jeannie Rueter on
USGBC has a Green Cleaning Policy template in the Resources section of the Credit Library.
v2009_Minimum Energy Performance Calculator_v6
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a project with VRF system for a LEED 2009 certification.
Exterior smoking policy
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Andrey Tsvetkov on
Dear all, We have a question about exterior non-smoking policy on the project NC.
Concerning Signatories
NC-2009 EAc3:Enhanced Commissioningposted by Omar Elrawy on
I need to know if the two signatories on the EA CREDIT 3: ENHANCED COMMISSIONING - LEEDOnline form are to be signed by the CxA, or by the owner?
Soil contaminated (by oil/diesel)
CS-2009 SSc3:Brownfield Redevelopmentposted by Julia Otero on
We are working in a project where a tank containing 6,000 lt of fuel has been detected in the soil.
WELL Certification Estimation Calculation
posted by Carina Clark on
Our team is trying to estimate about where our project is in achieving WELL certification (and at what level) prior to registration.
PV System on Campus Project
CS-v4 EAc5:Renewable energy productionposted by Annalise Reichert on
I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.