Reviewer's comment on MPR2
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Eric Bautista on
I am handling a new LEED building addition horizontally attached to a non-LEED existing building.
Showers?
CS-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Do the required number showers have to be placed together (near the bicycle racks) or can showers spread through-out the building be accounted for?
Combination of Survey/Tracking
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jason Cocek on
The building I am working on has a shuttle service that brings employees to work from various city stops as well as local train stations.
Table Plf3-2. vs. Table Plf3-3
NC-2009 PIf3:Occupant and Usage Dataposted by Michael Kennedy on
We have renovation of a college building. Most of the building is made up of faculty offices with some waiting areas and conference rooms.
Solar Reflectance of Porous Playground Paving Materials
NC-v4 SSc5:Heat island reductionposted by Steven Burke on
The reference guide does specifically mention that playgrounds are one of the non-roof areas that should receive shading, though after the one line where playgrounds are mentioned in parentheses, t
Number of thermal control panel and window needed
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Cathy W on
It is a mechanical ventilated office building. To achieve this credit: 1.
manufacturer statement - lack of exact numbers
NC-2009 MRc5:Regional Materialsposted by Anna Bak on
Hi, We have a manufacturer's statement and it says: "materials used to manufacture above mentioned products are approximately in 90% extracted/produced within 500mile radious from the constructio
Parking Capacity - Police Station
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Joe Malone on
Working on a new police station and trying to find a route to get SSc4.4 (LEED 2009). Anyone have any thoughts? We have public and secure parking which is for police vehicles only.
Appendix G Oversizing
CS-2009 EAc1:Optimize Energy Performanceposted by Jorge Torres-Coto on
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove
Reuse of existing building materials in the building parking lot
NC-v4 MRc1:Building life-cycle impact reductionposted by Greenlab on
Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.