Reviewer's comment on MPR2

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Eric Bautista  on 

I am handling a new LEED building addition horizontally attached to a non-LEED existing building.

0

Showers?

CS-v4 LTc6:Bicycle facilities
posted by  Sara Johansson  on 

Do the required number showers have to be placed together (near the bicycle racks) or can showers spread through-out the building be accounted for?

1
Tue Sep 20, 2016, 5:57 pm

Combination of Survey/Tracking

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jason Cocek  on 

The building I am working on has a shuttle service that brings employees to work from various city stops as well as local train stations.

1
Thu Oct 6, 2016, 4:44 pm

Table Plf3-2. vs. Table Plf3-3

NC-2009 PIf3:Occupant and Usage Data
posted by  Michael Kennedy  on 

We have renovation of a college building. Most of the building is made up of faculty offices with some waiting areas and conference rooms.

1
Tue Sep 27, 2016, 2:57 pm

Solar Reflectance of Porous Playground Paving Materials

NC-v4 SSc5:Heat island reduction
posted by  Steven Burke  on 

The reference guide does specifically mention that playgrounds are one of the non-roof areas that should receive shading, though after the one line where playgrounds are mentioned in parentheses, t

1
Tue Sep 20, 2016, 4:12 pm

Number of thermal control panel and window needed

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  Cathy W  on 

It is a mechanical ventilated office building. To achieve this credit: 1.

1
Tue Sep 20, 2016, 4:08 pm

manufacturer statement - lack of exact numbers

NC-2009 MRc5:Regional Materials
posted by  Anna Bak  on 

Hi, We have a manufacturer's statement and it says: "materials used to manufacture above mentioned products are approximately in 90% extracted/produced within 500mile radious from the constructio

1
Tue Sep 20, 2016, 11:04 am

Parking Capacity - Police Station

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Joe Malone  on 

Working on a new police station and trying to find a route to get SSc4.4 (LEED 2009). Anyone have any thoughts? We have public and secure parking which is for police vehicles only.

1
Tue Sep 20, 2016, 11:31 pm

Appendix G Oversizing

CS-2009 EAc1:Optimize Energy Performance
posted by  Jorge Torres-Coto  on 

I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove

1
Mon Sep 19, 2016, 5:00 pm

Reuse of existing building materials in the building parking lot

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Greenlab   on 

Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.

1
Tue Oct 11, 2016, 4:13 am