Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Manufacturing process

NC-v4 EAp2:Minimum energy performance
posted by  ignacio furniés  on 

My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.

1
Tue Aug 9, 2016, 1:56 pm

Demonstrate Savings for CRAC Units

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Gabriela Crespo  on 

Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.

1
Sat Aug 6, 2016, 6:33 pm

Environmental Tobacco Smoke (ETS) Control

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Vanessa W.  on 

For IEQ P2 Option A - do we need to have performance metrics in the policy we submit? Thank you

1
Wed Jan 18, 2017, 5:24 am

Enhance commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Mamdooh Amin  on 

Do we have to include the contract document between the owner and the CxA?

1
Tue Aug 9, 2016, 3:07 pm

MPR LEED v3 vs v4

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Lise Dannesboe  on 

Hi! There are quite some differences between MPR v3 and v4. USGBC has published a supplemental guide on MPR for v3. Is there something similar available for v4?

1
Tue Jan 17, 2017, 6:14 pm

CxA role

NC-2009 EAc3:Enhanced Commissioning
posted by  Abdulla Anwar  on 

Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?

1
Tue Aug 9, 2016, 3:27 pm

ID Credit for Radon Mitigation system

NC-2009 IDc1:Innovation in Design
posted by  Tyler Barter  on 

We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project.

1
Tue Aug 9, 2016, 2:50 pm

Building Demoliton outside my LEED Boundary

NC-2009 MRc2:Construction Waste Management
posted by  Faith Wilbert  on 

Hello, I'm currently working on a project where we are building a new dormitory. When the new dorm is up and running the existing dorm down the road will be demolished.

1
Sun Aug 14, 2016, 6:51 pm

what all is included in material cost

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Brianna Brandsen  on 

Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?

1
Mon Aug 15, 2016, 9:30 pm

Building footprint

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Febin Mohamed  on 

We are doing a campus approach for our project.

1
Tue Jan 17, 2017, 10:46 pm