Pilot Credit / ID Credit for NC
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Nicholas Bristow on
I am trying to use this on a new construction, residential project. Has anyone been successful in using this credit as a pilot credit or innovation credit for NC?
Hard-lid Ceiling
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Khaled Hamaideh on
Hi In our Project we can't apply deck-to-deck partitions in some janitor rooms so we are looking for (hard-lid ceiling) option.
Design submittal - Tender LOD Documentatio valid for EAp2?
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Velez on
Dear all, I'm am modelling a project that is aiming to get EAp2 at design submittal with Tender Documentation LOD (Level of Detail), meaning there are lots of parameter only defined by technical sp
Can I omit the IP credit since it is stand alone?
NC-v4 IPc1:Integrative processposted by wachira sosaeng on
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.
Narrative explaining compliance of ESC plan with NPDES guideline
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Madhura Dhayagude on
Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.
Energy Star compliant attic access doors
posted by Phil Vanderloo on
Can anyone steer me to a good source for a residential attic access door with compliant gaskets and insulation required by Energy Star V3? Thanks
ESC plan
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Imran Hasan on
Hi, Can anyone provide me Construction Activity Pollution Prevention based ESC Plan template. Thanks, Imran
Facilities and alterations. Outside the building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Mercè Llorca on
There are outside works planned to be done.
One building.
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by CT G on
We are currently working on a single office project for a corporate client.
Master Site Credit
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Megan Recher on
We registered this with our Master Site for a high school campus plan in Texas. The site includes multiple existing buildings as well as two new construction buildings.