Forum quick links
v2009 Project to comply using Building Automation System?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sara Greenwood on
Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m
n/a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Donna Juselis on
deleted
Landscaped area
NC-v4 SSc2:Site development - protect or restore habitatposted by Dina Ammar on
Does an existing landscaped area within a previously developed site count as Greenfield square-footage?
LEED 2009 EBOM
posted by Kasandra Martin on
I have an office building that is building a 2000 sq ft addition of offices. For EBOM I will include the entire building and not just the addition correct?
new LEED Online forum
posted by Tristan Roberts on
Hi! We have a new, central forum for keeping track of LEED Online issues and discussing updates.
new LEED Online forum
posted by Tristan Roberts on
Hi! We have a new, central forum for keeping track of LEED Online issues and discussing updates.
Energy Star equipment
CI-2009 EAp2:Minimum Energy Performanceposted by mingyu Zhang on
Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.
recessed walk off mat
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Bomin Kim on
We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.
CUP in group project
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Brightworks Sustainability on
I'm working on CI group project that is also using a central utility plant. My understanding is that each building must show compliance individually for lighting power density reduction.
Wastewater
NC-2009 WEc3:Water Use Reductionposted by Alejandro Macias on
I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing.