Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

School Culinary Garden - learning space

Schools-2009 WEc1:Water Efficient Landscaping
posted by  Peter Doo  on 

In a LEED 2009 NC Schools project: If the school incorporates a vegetable and herb garden for cultivation and use by culinary arts students as part of their curriculum, does this garden have to be

1
Sun Aug 27, 2017, 12:52 am

Application of the 1.67 allocation for the Option 1 & 2 combo

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Zane Lichtneger  on 

CIR ID#10410 allows projects to achieve SSc4.3 using a combination of Option 1 and Option 2.

1
Fri Feb 19, 2016, 4:44 pm

Rainfall Rates in Inches

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Ian McCall  on 

Dear LEEDers, Can someone confirm that a rainfall of 1 inch per 24 hours is 1 inch per 1 inch squared of ground surface? Thank-you, Ian

1
Fri Feb 12, 2016, 4:57 pm

choosing between CS and Hospitality

LEED Rating System Selection
posted by  GBD Architects  on 

Hi, we have a large project coming up that will be about 43% hotel and the rest CS.

1
Sun Apr 10, 2016, 12:16 pm

LEED Selection - High Rise Residential

LEED Rating System Selection
posted by  Curt Pascoe  on 

I am working on a unique project. 30 story existing historic building, office.

1
Wed Mar 30, 2016, 1:08 pm

Occupancy Sensors and 9.4.1.1

NC-2009 EAp2:Minimum Energy Performance
posted by  Curt Pascoe  on 

We are looking at a high rise residential project, to be NCV2009. Our electrician is stating all hallways need occupancy sensors.

1
Fri Feb 12, 2016, 10:07 pm

Defining landscaped areas

NC-2009 WEc1:Water Efficient Landscaping
posted by  Veronika Kozlova  on 

Dear all, Our project has a landscaped area that includes trees, shrubs and grass.

0

Retail Refrigeration

Retail-NC-v4 EAp4:Fundamental refrigerant management
posted by  Jason Smith  on 

I am currently working on a new retail construction project and would like to know if we should include the chilled drink cabinets (fizzy drinks, Milk etc.) within the Fundamental Refrigeration Cal

1
Thu Mar 3, 2016, 8:48 pm

LEED Boundary and Non-contiguous reconfigured areas

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aaron Ketner  on 

Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.

0

EBOM Solid Waste Management Policy in Medical Office Building

NC-2009 IDc1:Innovation in Design
posted by  Sara Goenner Curlee  on 

My project is pursuing LEED NC, and was hoping to use MRp2 as an innovation credit.

1
Mon Mar 13, 2017, 5:31 pm