Forum quick links
Separating Pantry Zone
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear all, I have a case where I need to know if I should model separate Pantry zone in Both Basecase and Proposed Case, or in Basecase only? I have an office building with one System 8
Fluorescent Light Tubes and Donation of Equipment
CI-2009 MRc2:Construction Waste Managementposted by Joseph Sneed on
I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.
Bird Collision Deterrence Monitoring Plan
Pilot-Credits SSpc55:Bird collision deterrenceposted by Ivan Romero on
Our intention is to pursue Bird Collision Deterrence under NC. Several questions: 1.
Shopping mall and Community Connectivity
posted by Nadia Azzam on
My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.
Non certified factory with new process area aiming certification
CI-2009 PIf1:Minimum Program Requirementsposted by Valentin Grimaud on
Dear community, We have had a recent enquiry from a client. He has an existing industrial site, which is non certified. He wants to relocate another industrial activity in this site.
fixture family
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by jorge calderon on
If we are using an exposed WC Flush Valve, which fixture family and fixture type should we choose in table WEp1-3?
recycling of existing floors or installation waste
EBOM-v4 MRc5:Solid waste management - facility maintenance and renovationsposted by Diane Martel on
I tried to find language and have not found any. what are the parameters on waste management?
Rail Station Proximity - On Demand Shuttle
Healthcare-v2009 SSc4.1:Alternative transportation - public transportation accessposted by Crina Bosch on
I remember hearing discussion at a Greenbuild Session that mentioned changing the restriction from 1/8 mile. Does anyone else know if this is true?
Changing Innovative Design Credits during Review Process
posted by Ralph Bicknese on
We are in the process of submitting a project for LEED construction credit documentation.
Temporary Irrigation but Reused Water
NC-2009 WEc1:Water Efficient Landscapingposted by Katherine Ann Resurreccion on
Has anyone secured a point under WEc1 without using either drip or sprinkler irrigation system?