Forum quick links
Lighting Building Area method
CS-2009 EAp2:Minimum Energy Performanceposted by Pia Öhrling on
If the building is an office building with a small part retail and restaurant how should the areas be calculated for lighting when using the Building Area method?? The space usage types listed in P
Baseline System configuration for mixed use condominium
NC-2009 EAp2:Minimum Energy Performanceposted by Jason Biondi on
We are working on a 10 story mixed use building consisting of approx.
SS CR 1 - Site Selection
CI-2009 SSc1:Site Selectionposted by Harsharan Kaur on
Hi, We are planning to get our facility certified under LEED CI (USGBC) Ver. 3.0.
CMU as regional materials
Homes-v2008 MRc2:Environmentally preferable productsposted by Benjie Herrera on
Can we achieve .5 pt. of Environmentally preferable product credit if we will be using CMU in the fence/landscaping area/grass area? Is this area considered as exterior wall? Pls. Advise.
Occupancy sensors: No override switch but with task lighting
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by André Harms on
Hi, There are several spaces in a project I'm working on that have been designed with an occupancy sensor without an override switch but each individual work station does have controllable (on/off
ASHRAE Standard
CS-2009 IEQp1:Minimum IAQ Performanceposted by ilkyaz ceren güçlü on
Hello, We are carrying out LEED certification of an office building.
Natural ventilation on a hangar
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renato Sandoval on
I am working on a hangar ventilated naturally by a clerestory on the roof top. This project would be applicable to the credit IEQ.c5 ?
Parking spaces
Retail-NC-v2009 SSc4:Alternative transportationposted by Megan Bove on
Would exterior on-site inventory/display parking of new cars for sale at an auto dealership count towards the total number of parking spots provided?
Parking spaces for trucks
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Alicja Bieszyńska on
My project is a distribution center that serves number of loading trucks every day.
Low-Emitting Materials Calculator
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Since October 1, there were updates on VOC requirements, but the calculator does not appear to have been updated.