Forum quick links
LEED Health Care 2009 MR Prerequisite 2: PBT Source Reduction
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by William Kelly on
For Uload L-14 providing calculations for collection space and projected waste: 1.
Where is M&V Plan in LEED v4?
posted by Charlie Christenson on
M&V seems to have completely disappeared from LEEDv4.
Preferred Parking for CS?
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Ellen Mitchell on
I have always assumed that this credit was pretty much the same for NC and CS projects - specifically that we must not exceed code minimum AND provide preferred parking for carpooling vehicles for
purchased heat pumps for ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Dear Group, As you know additional requirements from LEED led to purchased heat water coils being substituted for furnis heat coils in some unitary systems.
Upper and lower roof
Healthcare-v2009 SSc7.2:Heat island effect - roofposted by BABAR MEHMOOD on
There is a small pump room designed on the roof top.
greenfield or previously developed land?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Adi Negara, LEED AP BD+C on
Can anybody tell me in what category does the paddy (rice) field would fall under?
U-Factor for Vertical Fenestration
NC-2009 EAc1:Optimize Energy Performanceposted by TOMAS URIBE on
Hello, We are wondering if it is possible to perform a detailed simulation using the LBNL (Lawrence Berkeley National Lab) Windows Software to comply with the Fenestration Assembly U-Factor. Than
Selecting baseline for mixed use building
NC-2009 EAp2:Minimum Energy Performanceposted by Lavanya Veerappa on
We are working on a project which is mixed use facility (6 storey/G+5) . The first & 2nd floor is used for office & remaining for residential.
EA 5,1
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Muhammad Faisal Azizullah Jaffar on
We are working on a mall project going ahead with the LEED CS GOLD.We are currently on tender stage and the client has suddently come up with the LEED requirement.
Case 2 Calculator - Space Types
EBOM-2009 EAc1:Optimize Energy Performanceposted by Timothy Casper on
Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices).