Forum quick links
Providing verification that there will be side stream filtration
Pilot-Credits WEpc17:Cooling tower water useposted by Sara Greenwood on
Our project is pursuing an ID point for Pilot Credit 17 under the LEED-NCv2009 rating system.
Guidelines for large projects that are greater than 500,000 sf
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Lauren Sparandara on
Hello, I am working on a large development that has several buildings that are greater than 500,000 sf.
acrylic cove base adhesive for wall
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Benjie Herrera on
The acrylic cove base adhesive for wall is not listed in the LEED online-adhesive and sealant-non flooring. Where do we classify this adhesive?
Energy Model for building with under floor air distribution
CS-2009 EAp2:Minimum Energy Performanceposted by farhana imran on
We are working on a business tower with 2B+G+ 27+Roof floors. The tower has raised floor with UFAD/TDV systems from ground floor to 27th floors except toilets areas in each floor.
Change of rating system
posted by Lolita Wu on
Dear all We registered a project as LEED NC, but due to recent alterations, we need to switch it to LEED CS. How to change the rating system?
Which calculator version I have to use
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patricia Fuertes on
I have downloaded the "USGBC LEED 62MZCalc (May 2011) and I have to complete manually the cells that correspondon to the "Inputs of the system".
Non Potable Water Source Use
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Rajesh Ghorla on
What QC process can be added to identify variances from Standard Approach and what measures can be take.
Spaces smaller than 3000ft2
posted by Emmanuel Pauwels on
When the building entrance space is less than 3000 ft2, ASHRAE does not require a vestibule. (§ 5.4.3.4 Exception g) Is this correct?
adhesives for wall covering/wall paper
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Benjie Herrera on
Where do we classify in the IEQ 4.1 list the adhesives to be used for wall covering/wall paper?
COC Invoice for LEED Core & Shell v2.0 - MRc6
CS-2009 MRc6:Certified Woodposted by Juan Sergio Simborio on
Hi ! I need some help on FSC documentation. Our project is registered under the LEED Core & Shell v2.0 rating system.