NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Ellen Mitchell  on 

This week I have had two projects returned to me from the preliminary construction review with the same comment. I have never seen this comment before and am a little perplexed.

1
Tue Mar 27, 2012, 2:30 pm

EQ Credit: Acoustic Performance - Sound System Portion

General forums
posted by  Joseph F. Bridger  on 

I corresponded with our audio designers (Fred/Richard) and here is a summary of their comments. Since I submitted my comment already, I was not able to add their thoughts to the public comment.

0

Heat Island Reduction

General forums
posted by  Chris Munn  on 

There appears to be four options worth a total of two points.

0

Water Metering- Submetering- EB O&M

General forums
posted by  Chris Munn  on 

This credit is worth 2 points. According to the draft, you get 2 points for having two or more subsystems submetered, however if you only have one subsystem submetered, you get 0 points.

0

Retrocommissioning Investigation and Analysis

General forums
posted by  Chris Munn  on 

According to the draft, it appears that the commissioning investigation credit now requires both a Level II Audit and commissioning, as opposed to one or the other like the previous version.

0

Enhanced IAQ Strategies- EB O&M

General forums
posted by  Chris Munn  on 

Based on the way this credit appears in the draft, you get one point for having the 10 feet of matting, and then an additional point if you have either 1) MERV-13 filtration in place, 2) Carbon Dio

0
1
Tue Mar 20, 2012, 11:28 pm

No Green-e certification available

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Sustainability Provider  on 

Hello, Our building is pursuing for LEED EBOM 2009 vertification and we procure all of our electricity (no natural gas or other fuel type is consumed in our building) from a renewable energy provid

1
Thu Apr 5, 2012, 6:53 pm

LEED 2012 v3 - Material Life Cycle Disclosure and Assessment

General forums
posted by  Pamela Lippe  on 

The USGBC should continue to offer some version of its previous options for documenting material compliance. This new approach is not ready for prime-time.

0

MERV Filter Replacement

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Sheela I  on 

Prior to demo/During construction we have installed MERV 8 on the return air units. But after construction the replacement of the filters is managed by the building management.

1