Forum quick links
Energy and Atmosphere Comments
posted by Indya Rogers on
Operational Carbon Projection and Decarbonization Plan – project-specific modeling of energy use should be a minimum requirement; there is too much uncertainty introduced by allowing simpl
Materials and Resources Comments
posted by Indya Rogers on
ASSESS EMBODIED CARBON
Daylight Simulation
posted by KieranTimberlake on
Please consider the adoption of Useful Daylight Illuminance (UDI) for the daylight simulation metric. This annual metric acknolwedges both a lower and upper bound of usable daylight.
Skylights in Warehourse
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hello,
As of LEED v4 Indoor lighting pollution is a part of Minimum Energy performance credit.
Measuring TVOCs
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Rick Alfandre on
Has anyone ever used a device called the Airthings Wave Plus? We want to use it to report CO2 and TVOC numbers, but it reports TVOC's in ppb not ug/m3.
Materials and Resources | Optimized Building Products
posted by Jens Ewert on
Concrete Sustainability Council (CSC) responsible sourcing certification for concrete pertains to sustainable sourcing and manufacturing practices for concrete.
Framed assembly U-value calculation
NC-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi
Training on for Running In-House Energy Models
posted by Douglas Flandro on
We have several projects that are small enough that we don't hire consultants to run energy models. I just received permission to do some training so that I can run these models myself.
Question about Innovation: Purchasing - lamps for LEED v4 ID+C
CI-v4 INc1:Innovationposted by Courtney Royal on
I am confused, if you wanted to use this credit as an Innovation credit in a v4 ID+C project, does the entire base building need to comply or just your LEED commercial interiors project?
Purchasing - Lamps: EXIT signs
NC-v4 INc1:Innovationposted by Edgar Arevalo on
I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator. Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and