Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Credit relation to New construction/ Rennovations

NC-2009 MRc2:Construction waste management
posted by  BABAR MEHMOOD  on 

This credit is related to rennovation/ demolition for an existing or applies to the new buildings also, since its saying to recycle and/ or salvage constrction and demolition debris. Also, if you c

1
Mon Mar 11, 2013, 1:53 pm

Computer-based software: Estimating SW runoff rates and volumes.

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Nadia Ayala  on 

Hi everyone, While studying the GBD+C Guide, I noticed that under the Calculations section, says: "various methods and computer-based software programs are available to estimate stormwater runoff r

1
Mon Mar 11, 2013, 11:44 am

Credit achievement requirement clarification

NC-2009 SSc5.2:Site development - maximize open space
posted by  BABAR MEHMOOD  on 

The building has 2 roof levels, upper roof with the mechanical eqipements and the lower roof which has direct to the medical clinical floor (2nd floor).

1
Mon Mar 11, 2013, 4:48 pm

Fire-stopping sealant

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Joanna Bloniewska  on 

How would you qualify fire-stopping sealants? What VOC limit would you apply? I can't find it in SCAQMD rule 1168.

1
Mon Mar 11, 2013, 1:13 pm

What exactly is a medical furnishing?

Healthcare-v2009 MRc5:Furniture and medical furnishings
posted by  Catherine Blakemore  on 

The items below are for OR's, Scub Rooms, Corridors, Storage Room. Do the following count as medical furnishings or equipment?

1
Tue Jul 23, 2013, 8:54 pm

Gross Project Square Footage

NC-2009 PIf2:Project Summary Details
posted by  Catherine Blakemore  on 

When we registered one of our healthcare projects we entered it with a gross project square footage of 14,300. Under the LEED project, the 2nd floor will just a floor and shell, with no finishes o

1
Wed Mar 13, 2013, 12:46 am

MR Credits - Building product disclosure and optimization

General forums
posted by  Melissa Wrolstad  on 

Questions: For the BD+C Building product disclosure and optimization MR credits (MRc2, MRcr3, MRcr4), can someone please clarify: 1.) Between the three credits, are there 6 or 7 points available?

0

ID&C - EApr1 - preventing ID&C projects from achieving LEED?

General forums
posted by  Melissa Wrolstad  on 

To achieve the ID&C EApr1 – Fundamental commissioning and verification, per version 6 of the LEEDv4 draft of this prerequisite a project team must “prepare and maintain a current facilities req

0

asbestos roof

General forums
posted by  Tristan Roberts  on 

No, LEED does not have specific requirements such as replacing certain kinds of roofing.

0

Gray area of commingled vs on-site sorting

NC-2009 MRc2:Construction waste management
posted by  Stantec IP - Dupe - Do not use  on 

During a demo of an existing building, many items were sorted onsite and sent to a specific recycler.

1
Mon Mar 11, 2013, 10:39 pm