Forum quick links
Exemplary Performance Interpretation
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Cassandra Kail on
I am hoping to get an exemplary performance credit for Public Transportation Access.
Measurement Method - Submittal Semantics
CI-2009 IEQc8.1:Daylight and views - daylightposted by Jeremy Theodore on
From anything I have read, Credit IEc8.1 is a design credit, which would obviously suggest it be submitted with the "design" submittal in a split submittal. It however offers the option to measure
USGBC BPP
Pilot-Credits PC38:Advanced Utility Trackingposted by Sara Aschliman on
How do i as the Homeowner, "enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification."?
Sound Diffusing Ceiling Panels excluded as furniture?
Schools-2009 MRc7:Certified woodposted by Gary Mosesman on
Hello, Can we exclude the sound diffusing ceiling panel assemblies from the certified wood credit, and categorize them as furniture?
Washout Waste
NC-2009 MRc2:Construction waste managementposted by Abena Darden on
I've seen previous discussions as to equipment clean-up water waste not being applicable to this credit, but in our project, water and aggregate is generated by the installation of materials.
Mechanical Plans still under design
NC-2009 PIf4:Schedule and Overview Documentsposted by Gaston Viau on
We haven't finished yet the design of the mechanical system, so the mechanical plans that we have are just a current aproximation. Is it mandatory to upload the mechanical drawings during the desi
Exemption in Retail Rating System
NC-2009 PIf3:Occupant and Usage Dataposted by Hatice G. on
I am looking in which rationg system my project can be classified. It has 88% Retail with storages, 7 % offices and 5% nursery. Can we use Retail and the office and nursery falls into an exemption
Document review
NC-2009 EAc3:Enhanced commissioningposted by Adam Rustige on
Is reviewing I&O manuals and as-built drawings a requirement for enhanced commissioning? Thanks
Sunset Date & Multiple Buildings
posted by Cassandra Kail on
I'm working on a project that has a Master Site and 2 buildings, Bldg A and Bldg B. Bldg A is scheduled to be finished and occupied 2 years before the Master Site and Bldg B are finished.
Design Submittal
NC-2009 IEQc8.1:Daylight and views - daylightposted by Gaston Viau on
This credit cannot be submitted on the deign phase if we choose option 3 (measurement) right? Thanks in advance for your time.