Forum quick links
blower-door testing for hotel rooms with interior brick walls?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jutta Berns on
we have a hospitality project in south africa where a number of rooms will be (quietly) designated smoking rooms.
Upload Blower Door test results in design stage?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Maria Porter on
IEQp2 is a design prerequisite. For residential units, (smoking allowed), we have to upload blower door test results. Since it is in design stage, there is yet nothing to perform testing on.
Variable Speed Fan Coil Unit
NC-2009 EAc1:Optimize Energy Performanceposted by James Chueh on
There are more and more companies making fan coil units with VFD motors, automatic variable supply air control rather than traditional 3-speed control, which gives them variable air volume capabili
Cancellation due to inactivity
posted by Agustina Galli on
Hello! does anybody know where are the cancellation policies for projects?
Campuswide and Multi Building Documentation
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Brian Moran on
Does anyone have experience demonstrating compliance for campuswide or multiple buildings? We would like to document this credit for campuswide submission.
Energy Modeling a Concrete Dome
NC-2009 EAc1:Optimize Energy Performanceposted by Nelina Loiselle on
We are completing an energy model for a concrete dome. We chose the dome structure because it is more energy efficient than conventional building types. This was a design decision.
Ashrae 90.1, section 6.4 minimun equipment efficiencies
CS-2009 EAp2:Minimum Energy Performanceposted by Agustin Bertolotti on
Hello everyone We have a project in Uruguay in which our clients want to use a 350 tons centrifugal chiller with a 8.41 IPLV and 5.65 COP. Table 6.8.1C shows minimum efficiencies for this chiller