Power Purchasing Agreement (PPA) in lieu of REC
NC-2009 EAc6:Green powerposted by Jamison Hill on
Here in NYC, most costumers choose to purchase supply from a third party source, such as an ESCO, that is independent of their utility provider.
Innovation in Design credit denied
NC-2009 IDc1:Innovation in Designposted by Tracy Baker on
We attempted an Innovation in design credit for our project. The strategy for this was reusing existing foundation elements in the support of a new 18 story high rise building.
Foreign currency - Israel
posted by Ilan Yahav on
Hello, I have to complete Table L-3.
What sets precedence - project role of owner or designer?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Dave Hubka on
The project is over 50,000 square feet and we are the owner and commissioning authority and designer of record. What commissioning services are we allowed to provide, fundamental or enhanced?
RCP's and Precertification
posted by Charles Nepps on
We just received back the result of our PreCert review (project outside US) and are a few points short of our desired level.
DOOR Core
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by jack larson on
My door core consists of the following: Gypsum, organic fibers, fiber glass and inert binders. Does my door core classify as composite wood?
Site Lighting
NC-2009 EAc1:Optimize Energy Performanceposted by William Holub on
Thanks in advance for any insight. I have a two part question – 1. I want to confirm that all site lighting within the LEED boundary can and should be included in the energy model.
Storage Tanks, then release to municipal system ok?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Norma Lehman on
your comment above states: Is it an acceptable strategy to capture the rainwater into tanks and discharge it into the public sewers after the rainstorm reducing the peak discharge?
Disposers not allowed under WEc4 2009 but ok in healthcare??
Schools-2009 WEc4:Process water use reductionposted by Suzanne Painter-Supplee, LEED AP+ID&C on
Question: There is a disposer standard under LEED for Healthcare, water usage 3-8 gpm in active use.
Equipment turned off
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Rudolph Carneiro on
Does anybody know whether chilled water and AHU's must be operating to use portfolio manager. We have a client that just does not turn on corridor 100% OA units for his building.