Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Separate CxA's for Fundamental and Enhanced Cx?

NC-2009 EAc3:Enhanced Commissioning
posted by  Timothy Casper  on 

In a traditional design-bid-build project, does the CxA need to be responsible for both fundamental and enhanced Cx? Or can these credits be split between two CxA's?

8
Default Avatar
Tetra Tech
LEEDuser Basic Member
3 thumbs up
Thu Aug 6, 2015, 4:06 pm

Coffee Shop

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathryn West  on 

Gosh, this credit is never 100% in the "yes" column when you have a building that is not a traditional office space. I have a coffee shop in my building.

3
Wed Aug 5, 2015, 7:54 pm

building is eligible or not

CS-2009 IEQc7:Thermal Comfort—Design
posted by  Ron Dean  on 

I am bit confused about the requirements of the Thermal comfort-desing’ credit for C&S Can you please help me on figure out if my building is eligible or not. The building is mechanical ventil

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Aug 5, 2015, 6:19 pm

Residential high rise with school at the base

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Ilana Judah  on 

We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 5, 2015, 2:32 pm

Do we include Non-certifiable structure in Building gross area?

NC-2009 MPR7:Must comply with a minimum building area to site area ratio
posted by  Anya Fiechtl  on 

We have a project with a main facility and a separate non-occupied, non-certifiable equipment/storage building.

6
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Aug 5, 2015, 2:31 am

Vehicular control - Tire washing control

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  LEED Pro Consultant  on 

Hello all, I have a question regarding the control measure for the control for all the vehicles leaving the project, the most common is cleaning all the vehicles (washing the tires) before leaving

4
Tue Aug 4, 2015, 10:03 pm

Zone Floor Area Calculation

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Maggie Hogan Skaug  on 

For the prescriptive method, how is Zone Floor Area calculated for a multi-floor office building with no tenant build-outs? Is the ZFA = 2 times the window head height? Thanks

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Aug 3, 2015, 5:31 pm

"incomplete spaces" treatment in LEED NC

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

1) An office building that is being certified under LEED NC will have 20% of its gross floor area without a complete interior fit-out at time of construction work completion.

9
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Mon Aug 3, 2015, 1:18 pm

Commissioning Documents

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Heather Anderson  on 

What documents are necessary to complete EA Prerequisite 1? So far, I have: 1. Fundamental Commissioning of the Building Energy System (Found on the USGBC website) 2.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Aug 3, 2015, 7:25 am

n/a

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Leanne Niu  on 

I am dealing with a complex commercial center containing a indoor ski center and a ice rink, which clearly fall outside of the comfortable zone of ASHRAE 55.

2
Default Avatar
Energy Engineer
7group
LEEDuser Basic Member
18 thumbs up
Sat Aug 1, 2015, 12:28 pm