Forum quick links
LEED AP
NC-2009 IDc2:LEED Accredited Professionalposted by TEY SIUNG on
How to upload my LEED AP certificate to earn the point ?
EAp2 - Design and Buildt Contract
NC-2009 EAp2:Minimum Energy Performanceposted by André Knutsson on
Consto have a Design and Buildt Contract with the project owner. The Architects contracts is a part of the contract. His role in the project is design and drawing.
MRc5 Metal Stud... Assembly? Reused Furniture Manftr AND Extrxn?
CI-2009 MRc5:Regional Materialsposted by Simon Sue on
In review comments recently received by our team for a LEED-CI Retail project, the following portions have confused us: 1. "Products from _____ vendor...
Clarification
posted by Alexa Stone on
Hi Puteri, Your wording is a little confusing. I think what you are trying to ask is what LEED Rating system would use for a new construction District Cooling Plant?
Purchases for Repairs
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Reynaldo Castro on
We are a convention center and certified under pre-existing building requirements. We have a lot of shows and clients moving in and out.
uncondtioned space and natural ventilation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
Hello We are working on a office building applying for LEED CS. The building is going to be naturally ventilated.
Baseline system selection for Laboratory
NC-2009 EAc1:Optimize Energy Performanceposted by Ramesh Narayanan on
G3.1.1 exception c stating "For Laboratory spaces with a minimum of 5000 cfm of exhaust, use system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of the design values during unoc
Is exterior lighting included?
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Aaron Levey on
We have a restaurant project (LEED for Retail: CI) in which the tenant has a open space. There is a canopy outside used for retail purposes and obviously some exterior lighting.