Forum quick links
ASHRAE 90.1 2007 - Evaporative humidifier/ cooler
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Dears Sirs, In ASHRAE 90.1 2007 APPENDIX G, in baseline simulation, when I should use evaporative humidifier/cooler? Many Thanks Ricardo
PV Energy - Sent straight to the Grid
NC-2009 EAc2:On-Site Renewable Energyposted by Sara Heppe on
My project is LEED NC version 2009, and consists of two buildings. One, the Lodge, is the building pursuing LEED Certification.
LEED EBOM 2009 EA Prerequisite 2 & Credit 1 - ACP
posted by Eric Johnson on
Has anyone else noticed that some of the ACP documents state that international projects can't use Energy Star for energy benchmarking or energy performance?
Existing Chiller in 100% building construction refurbishment
CS-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
I am wondering how to handle an existing chiller in a LEED C&S project. The building of the C&S project got 100% refurbishment for the building constructions. The central chiller plant has
Default percentage for removal of TSS by dislodging in a lagoon
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by marisol cano on
Hello to all. Hope you can help me with this one.
M&V for C&S buildings of varying occupany when complete
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
I have another question related to my last one regarding M&V and the energy model.
peak flow calculations for 24-hr duration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Chris Olson on
Hello - My question is in regards to the 2-yr, 24-hr requirement for calculating peak runoff rate.
How to quantify a evaporation rate
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian Lodes on
I was hoping I could get some advice on obtaining the quantity requirement of SS CR 6.1. We are trying to obtain this credit on an approximate 19 acre site.
Defining Casework/Millwork (MRc6, IEQc4, MRc5)
posted by Simon Sue on
For a current project we would like to clarify how LEED defines casework/millwork across multiple credits: If we would like to pursue MRc6: Design for Flexibility, using the last option "use movab