Occupancy for a Fire Station

NC-2009 PIf3:Occupant and Usage Data
posted by  Dominique Arrieta  on 

I am working on LEED Submittals for 6 Fire Stations that are under construction at the same time.

1
Thu Mar 28, 2013, 8:50 pm

Purchasing fluorescent UV lamps for HVAC system

EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lamps
posted by  Janki Vyas  on 

Our office has to purchase replacement UV lamps for our air filtration system. The manufacturer recommended lamps are fluorescent and contain a low level of Hg (3 Mg).

1
Fri Mar 8, 2013, 6:29 pm

Concrete Adhesives - which limit to spec?

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Jenelle Shapiro  on 

We have the following materials called out in the 03 30 00 Cast-in place concrete spec: 1. Semi-rigid joint filler 2. Bonding Agent 3.

1
Fri Mar 8, 2013, 7:34 pm

Minimum floor area requirements for EQc4.3?

CS-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Gabriela Hernández Castillo  on 

For C&S project the main floor surface for common areas is specified as natural stone (granite), which I understand is not considered for this credit.

1
Mon Mar 11, 2013, 2:18 am

Credit relation to New construction/ Rennovations

NC-2009 MRc2:Construction waste management
posted by  BABAR MEHMOOD  on 

This credit is related to rennovation/ demolition for an existing or applies to the new buildings also, since its saying to recycle and/ or salvage constrction and demolition debris. Also, if you c

1
Mon Mar 11, 2013, 1:53 pm

Computer-based software: Estimating SW runoff rates and volumes.

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Nadia Ayala  on 

Hi everyone, While studying the GBD+C Guide, I noticed that under the Calculations section, says: "various methods and computer-based software programs are available to estimate stormwater runoff r

1
Mon Mar 11, 2013, 11:44 am

Credit achievement requirement clarification

NC-2009 SSc5.2:Site development - maximize open space
posted by  BABAR MEHMOOD  on 

The building has 2 roof levels, upper roof with the mechanical eqipements and the lower roof which has direct to the medical clinical floor (2nd floor).

1
Mon Mar 11, 2013, 4:48 pm

Fire-stopping sealant

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Joanna Bloniewska  on 

How would you qualify fire-stopping sealants? What VOC limit would you apply? I can't find it in SCAQMD rule 1168.

1
Mon Mar 11, 2013, 1:13 pm

What exactly is a medical furnishing?

Healthcare-v2009 MRc5:Furniture and medical furnishings
posted by  Catherine Blakemore  on 

The items below are for OR's, Scub Rooms, Corridors, Storage Room. Do the following count as medical furnishings or equipment?

1
Tue Jul 23, 2013, 8:54 pm

Gross Project Square Footage

NC-2009 PIf2:Project Summary Details
posted by  Catherine Blakemore  on 

When we registered one of our healthcare projects we entered it with a gross project square footage of 14,300. Under the LEED project, the 2nd floor will just a floor and shell, with no finishes o

1
Wed Mar 13, 2013, 12:46 am