Forum quick links
Low Mercury Lamps
NC-2009 IDc1:Innovation in Designposted by Michelle Rosenberger on
It has always been my understanding, underscored by the LEEDuser LEED EBOM reference above in the Birdseye narrative, that an NC project could achieve an ID credit by complying with an EBOM credit.
Snow Melt
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Elizabeth Felder on
We have an ice melt product that consists of CMA and Dolomite (and a proprietary blend), but the manufacturer will not release the chemical breakdown.
Kitchen exhaust in Multifamily buildings
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on
Hi everyone,
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awar
NC-v4 WEc1:Outdoor water use reductionposted by Nandan Tavkar on
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarded as 100% reduction (2 points)? Please confirm
Parking Generation Manual, 5th Edition
NC-v4.1 LTc7:Reduced Parking Footprintposted by Renee Azerbegi on
Does anyone have a copy of the Parking Generation Manual, 5th edition that they can share? It is really expensive and I just need a couple exerts for LEED calculations.
Calculating FTEs and regularly occupied spaces: Auditorium
posted by Carlos Bueno on
Hello everyone,
Are jet bridges inside or outside the building envelope?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Theresa Lehman on
I am working on an airport project. Are jet bridges (Division 11), considered to be inside or outside the building envelope?
Quality Views - Objects 25 Feet
NC-v4.1 EQc8:Quality Viewsposted by Alexandre Penegre on
Does every "object" outside of 25 feet count? The "quality" views would be facing a parking lot and then there are the backs of retail buildings 300 feet away.
Legal Wood Help
posted by Laura Soma on
Hi All -
I have a non-profit project that has a lot of wood structure to it, but the truss suppliers have both said they cannot get FSC wood for the project.