Forum quick links
Babies - Water Consumption
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Adriana Hansen on
I'm working on a preschool project, which will have 30 babies between 4 months to 1 year-old; 30 babies between 1 to 2 years-old; 30 babies between 2 - 3 years-old; and 30 babies between 3 to 4 yea
Rubber Walk-Off Mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Dave Wortman on
We are contemplating the use of a rubber walk-off mat for a high traffic area at a winter resort with lots of snow.
Energy Efficiency Verification (EEV) vs Energy Star
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Monika Mickute on
Hi, We purchased a Kenmore Refrigerator for our new office, which is pursuing LEED CI, and instead of it having an Energy Star sticker, it says it is EEV Rated.
New PI Form 2 Version 4.0
posted by Ross Spiegel on
I am working with the latest version of PI Form 2 on a project and it includes several new lines to complete.
Appeal Process - Submitting all credits at once ?
posted by Maya Karkour on
Dear all, Do any of you know if we are supposed to submit all the appeals at once ? or can we submit them gradually ? Thank you for your help,
FSC and New Wood in LEED for Homes
posted by Judy Landwehr on
Regarding FSC certified wood-Is the calculation in LEED for Homes the same as in LEED NC as it pertains to only allowing "new wood" and if so, where is this referenced.
Minimum Thresholds for Landscape Credits
posted by Sam Watters on
My project is pursuing LEED for Homes: Multifamily Midrise, and I'm, wondering if it has enough landscaped area to qualify for some of the water efficiency and other landscaping credits. The build
EQc6.2 and EAc1.3 for Zoning and Controls
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Megan Snyder on
Is it possible to achieve these simultaneously? One appears to require manual control and the other, auto control.
Option 2 Path 4 Heat island Effect nonroof
CI-2009 SSc1:Site Selectionposted by Sue Barnett on
so my CI LEED project boundary is half of one floor of an 8 story building, it's 14,000 square feet, and does include an exterior courtyard.