Existing building constructions with new data center
NC-2009 EAp2:Minimum Energy Performanceposted by Ross Farris on
Hello, I am going to be modeling an existing building for 2009 NC and we are adding a large data center to an interior space on the top floor of this building.
Wood Casework for laboratory
NC-2009 MRc7:Certified Woodposted by Eri Spaulding on
I have wood caseworks with bamboo veneer on it which are specified under Div. 11. I assume since this is under Div.
Occupied space-
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Greengrade User on
Is the gymnasium and kitchen in a school considered a regularly occupied space?
FTE vs ASHRAE 62.1 occupancy
CS-2009 IEQp1:Minimum IAQ Performanceposted by Edwin Wealend on
Hi All For a C&S project there are default FTE occupancy figures that shoudl be used for water calcs, bicycle racks etc where the final occupancy is not known.
CalGreen Clean Air Vehicle and LEED SSc4.3
posted by Sonrisa Lucero on
CHP system
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
in the project we are modelling, hot water system is preheated from the building power generators by using recovery system isntalled on the genertars ( same principle of the recovery chillers) but
alternative NFRC test
NC-2009 EAp2:Minimum Energy Performanceposted by Jae Yong Park on
hello as my project is outside of U.S, getting certification of NFRC is very difficult. in this contry has a similar test certification that comply with ASTM and this conutry reconized BUT it is no
movable furniture not in scope of credit
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Tristan Roberts on
I was reviewing the LEED addenda and noticed an interesting one for this credit.
baseline systems
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
I m modeling a 52 floor building and 2 detached retails buildings,The proposes system are chilled water system with FCU except : 1-8 floors core and shell ( m0re than 78000 sqft) 2- G+2floors
phased campus plan using 2010 AGMBC
posted by Norma Lehman on