Forum quick links
SCM's and Project Material cost
NC-2009 MRc4:Recycled Contentposted by William DeBruhl on
I understand how to calculate recycled content using the SCM calculation for concrete.
VOC Acceptable Levels Listing
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Tim Crowley on
Where can I find a listing of the acceptable VOC levels (in accordance with CA Section 01350) for the various IEQc4 credits for my LEED Schools 2009 project?
Local currency
NC-2009 MRc4:Recycled Contentposted by Alicia Villanueva on
I would like to know if this credit form can be populated in the local currency instead of dollars. This inquiry would affect credits MRc4, MRc5, MRc6 and MRc7.
Fitness Center water use
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Michael Smithing on
We have a fitness center in our building and I'm looking for guidance on how to model water use in the facility.
Plant Confusion
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Elizabeth Crenshaw Hammitt on
Our building staff maintains one small (less than 1,000 sq feet or so) Memorial Garden that we do not own, and several very small beds of vines and trees on the side walk surrounding our building f
Kitchen Consumables
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Alexa Stone on
Does anyone have any experience or guidance regarding these products included in this credit for multi-tenant buildings?
Commingled Waste Documentation
NC-2009 MRc2:Construction Waste Managementposted by Angie Allen on
Off-site sorting of the construction waste was used for our project. The hauler/material recovery facility provided project-specific recycling rates for each haul by material type.
Selling SREC's question
NC-2009 EAc2:On-Site Renewable Energyposted by Todd Bundren on
I am working on a project with two large solar arrays on a parking garage, both are separately metered.
Measurement option and 500fc limit
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Erin Holdenried on
For Option 3 Measurement, can an area with measurement greater than 500 fc count towards the credit if the space has glare control devices, such as internal shades?
Are you kidding me?
posted by Karen Joslin on
Opened the email with the "news" and instead of adding the very much needed individual memership structure for all those folks out there whose organization will not join USGBC or connect them to th