Performance Period

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Paola Figueiredo, Newton Figueiredo  on 

Our team submitted a project demonstrating that the building had its performance period for a specific credit done during one (1) year, although the changes and alterations had been made during two

4
Thu Oct 18, 2012, 3:17 pm

Natural Ventilation - airflow rates

NC-2009 EAc1:Optimize Energy Performance
posted by  Sonia Martini  on 

Hi! The building i need to simulate is naturally ventilated and is located in Italy (climatic zone 4A). Which outdoor air rates must be set in the Baseline and Prosposed Case as natural ventilation

3
Thu Oct 18, 2012, 3:14 pm

Is the new LEED v4 for facilities managers? Are FMs needed?

General forums
posted by  Peter Kimmel  on 

First, I want to congratulate the USGBC on all the progress it has made in developing a more complete tool that more-than-ever reflects what it takes to make a green building.

4
Thu Oct 18, 2012, 2:53 pm

IEQc6 Theater/auditorium controls

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Cristian Wolleter  on 

Hi, we are working on a theater (capacity: 500 people) and we don't know if we should include lighting and HVAC controls for the audience.

2
Thu Oct 18, 2012, 12:41 am

40 CFR

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Bruce Maine  on 

I have noticed in several purchased specifications products, ARCOM for example, a reference to 40 CFR 59, Subpart D (EPA Method 24) as related to VOC content.

2
Wed Oct 17, 2012, 5:06 pm

Relocation

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Kath Williams  on 

If you move a core and shell to a new location, it is building reuse or materials reuse?

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Oct 17, 2012, 2:13 pm

Latest lighting control technology

NC-2009 EAc1:Optimize Energy Performance
posted by  David Weigel, PE  on 

Hi all, Mid-design, the building owner has decided to implement the Lutron Quantum system.

5
Wed Oct 17, 2012, 1:53 pm

Metering Requirements Case 1

CI-2009 EAc3:Measurement and Verification
posted by  Matthew Tovar  on 

For case 1 (project less than 75% of the total bldg sqft), can temporary metering fulfill the metering requirement? If so, under what circumstances (e.g.

3
Wed Oct 17, 2012, 1:34 pm

a few questions on credit 6.1

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Guilherme Castagna  on 

I have a few questions on this credit that are buggering me off.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Oct 17, 2012, 12:22 pm

Does a man-made pool meet the requirement?

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  yan lian  on 

Our project has a man-made pool and has vegetation and fish in the pool, I don't know whether it can meet the requirements?

2
Wed Oct 17, 2012, 8:35 am