Forum quick links
90% of average annual runoff
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Jamison Hill on
Is that the pre-development runoff rate or post-development runoff rate?
LEED NC 2009 for factory buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
The project is a manufacturing facility with ancillary buildings such as admin, health centre, canteen, utility and security blocks. The buildings are not physically connected to each other.
GREENGUARD Gold (formerly Children & Schools), CA 01350, CARB II
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Linda Davisson on
Since LEED-S projects can use NAUF compliance in place of CA 01350, can a NC or CI project use CA 01350 compliance or GREENGUARD Gold (formerly children & Schools) or CARB II in place of NAUF?
Energy Modeling for Casino
NC-2009 EAp2:Minimum Energy Performanceposted by Chris Hammett on
Hello. I am working on the energy model for a casino/hotel/nightclub. I have been contracted only to develop the model, no input in regards to design.
Post occupancy installation of photovoltaics as an appeal
NC-2009 EAc2:On-Site Renewable Energyposted by Kris Phillips on
We have a project that may be 1 point short of the next level certification after its Construction Final Review and we have been asked to look at options to add a credit or two as an "appeal" to re
HVAC system's capability to accommodate CO2 sensors
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by CT G on
We are working in a CS project without any densely occupied spaces. The project contains VRF units to condition spaces and one fan supplies outdoor air to these units.
Two options for compliance (pictures or signature)? IEQ cr3.1
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Thomas Boyd on
Hello all - Our construction team has completed our project.
Baseline Fan Power Heat Recovery
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I have a few questions on baseline fan power taking credit for heat recovery in the proposed building. 1.
Anticipated Tenant Fit Out and IEQ compliance
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Paula Hernandez on
Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo