Forum quick links
Does Option 2. apply for underground parking
NC-v4.1 SSc5:Heat Island Reductionposted by Gwenael JAN on
Hello,
Does a "Hot Zone" in a Fire Station need individual door closers?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Adrienne Franz on
Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus bay, decontamination room, a restroom, tool storage, lawn storage, turnout gear lockers, a janito
Biophilic Sukkah Competition - Call for Submissions!
posted by Misha Semënov-Leiva on
I'm so excited to share that the call for submissions is now open for 16cubits, a design festival and competition for the Jewish holiday of Sukkot, to take place at Berkeley’s Urban Adamah in
REACH and Global Green Tag certification count for the Optimization
NC-v4.1 MRc4:Material Ingredientsposted by Summer Gorder on
Can REACH and Global Green Tag certifications count for the Optimization even if they aren't international projects?
Process Water and Arc
EBOM-v4.1 WEc1:Water Performanceposted by Jenni Betancourt on
I've been trying to communicate with Arc with no luch. We have Arc Essentials which supossedly could help us determining our potential score.
How can I download the baseline html files at different rotations? in designbuilder.
posted by Jhon Sariego on
I am working on a project and I need to download the html files at different rotations in the baseline. 0, 90, 180, 270.
Would a fire sprinkler system count as "other process water"
NC-v4 WEc4:Water meteringposted by Cindy Quinn on
Has anyone had success with a fire sprinkler system being one of the subsystems? Would it count as "other process water"?
TIA!
LTc Compact & Connected
posted by Emily Purcell on
"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category."
Pilot Closed - attending LEED v4.1 Optimize Process Water Use
Pilot-Credits WEpc94:No Cooling Towerposted by Adriana Hansen on
This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 in
Pilot Closed - attending LEED v4.1 Optimize Process Water Use
Pilot-Credits WEpc94:No Cooling Towerposted by Adriana Hansen on
This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 includ