Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Does a "Hot Zone" in a Fire Station need individual door closers?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adrienne Franz  on 

Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus bay, decontamination room, a restroom, tool storage, lawn storage, turnout gear lockers, a janito

0

Biophilic Sukkah Competition - Call for Submissions!

Green Commons
posted by  Misha Semënov-Leiva  on 

I'm so excited to share that the call for submissions is now open for 16cubits, a design festival and competition for the Jewish holiday of Sukkot, to take place at Berkeley’s Urban Adamah in

0

REACH and Global Green Tag certification count for the Optimization

NC-v4.1 MRc4:Material Ingredients
posted by  Summer Gorder  on 

Can REACH and Global Green Tag certifications count for the Optimization even if they aren't international projects?

 

1
Thu Apr 18, 2024, 12:29 pm

Process Water and Arc

EBOM-v4.1 WEc1:Water Performance
posted by  Jenni Betancourt  on 

I've been trying to communicate with Arc with no luch. We have Arc Essentials which supossedly could help us determining our potential score.

1
Thu Apr 18, 2024, 6:31 am

How can I download the baseline html files at different rotations? in designbuilder.

LEED v4.1 Discussion Forum
posted by  Jhon Sariego  on 

I am working on a project and I need to download the html files at different rotations in the baseline. 0, 90, 180, 270.

1
Fri Aug 2, 2024, 3:54 am

Would a fire sprinkler system count as "other process water"

NC-v4 WEc4:Water metering
posted by  Cindy Quinn  on 

Has anyone had success with a fire sprinkler system being one of the subsystems?  Would it count as "other process water"?

TIA!

1
Wed Apr 17, 2024, 6:46 am

LTc Compact & Connected

LEED v5 BD+C/ID+C: Location and Transportation Public Comments
posted by  Emily Purcell  on 

"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category."

1
Tue Apr 16, 2024, 6:59 pm

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 in

0

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 includ

0