ASHRAE compliance with naturally ventilated building
NC-2009 EAc1:Optimize Energy Performanceposted by Jean Marais on
As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally ventilat
Distribution and Vintage of REC's purchased in a Portfolio
NC-2009 EAc6:Green powerposted by Eric Elizondo on
Our client is a national banking program that has purchased REC's as a corporation in 2010 and 2011 as part of a corporate portfolio program.
Applicable for On-Site Renewable credit?
NC-2009 EAc2:On-Site Renewable Energyposted by Jeff H. on
My company is considering a geothermal system for an industrial facility.
SS 1 Option 2 Path 9
CI-2009 SSc1:Site Selectionposted by Augusto Velazquez on
I am having trouble filling out the LEED Online template for option 9.
why do we need to model heating if we have none
NC-2009 EAp2:Minimum Energy Performanceposted by Alicia Villanueva on
I am working in projects in Mexico and it has been a challenge to model heating when we have none. Sometime when modeling heating comes out higher in the proposed design than in the baseline and t
LEED registered projects
posted by Tristan Roberts on
Ed, USGBC maintains a database of registered LEED projects.
How many CO2 sensors are required per space?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by William Wong on
Credit requires to monitor CO2 level for densely occupied spaces. Is there any requirements for the minimum no. of sensors per space / sq ft?
calculation assumptions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Susan Walter on
Now that we're digging into the credit, we have questions on the assumed thickness for items that are a SF input.
LEED for Homes - MR 2.2
posted by Natalie Connor on
This is my first time working on a LEED project for a residential construction company and I'm trying to finish up the final paperwork (basically the MR 2.2 section).
Green Advantage Innovation Credit for 2009 BD&C & NC v2.2
NC-2009 IDc1:Innovation in Designposted by liz boastfield on
Projects staffed with 30% or more of key personnel certified through Green Advantage are now eligible for award of 1 Innovation point.