Difference between v4 and v4.1

Pilot-Credits EApc161: Electrification ACP: Energy Simulation Performance Path
posted by Camilo Velez on Feb 1, 2024, 10:12 pm

Good evening,

I have been reading about this ACP, but there are a couple of questions that I still have regarding the applicability:
 

ASHRAE 90.1 version...

Option 1 Path 2/3- Natural Ventilation and DES

CS-v4 EAp2: Minimum Energy Performance
posted by Azra on Feb 1, 2024, 5:09 am

Hello,
 
we got a kind of an unusal situation here, at least for us. 
So the project is connected to a...

Modeling indirectly conditioned spaces

NC-v4 EAp2: Minimum Energy Performance
posted by Gaston Michaud on Jan 31, 2024, 6:55 pm

Hi all, 

We are working in a CS project, and just got back the following comment from the LEED Reviewer: 

The SV-A reports indicate that most of the core spaces were modeled as...

Modeling Proposed DHW with Insulation

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Jan 31, 2024, 2:07 pm

Hi I am Modeling a...

Last reply: Marcus Sheffer, Jan 31, 2024, 5:32 pm

Onsite and Offsite Both?

Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protection
posted by Umesh Atre on Aug 25, 2023, 1:09 pm

Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?...

Last reply: Michaël Briffaz, Jan 31, 2024, 10:57 am

Can ID+C be selected for whole building?

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Leo LeQuoc on Jan 29, 2024, 11:27 pm

Our team is working on a project of a whole 2-storey (to be) newly constructed office building.

I wonder (1) whether we can apply both floors to ID+C rating system or it has to be a single...

Last reply: Dave Hubka, Jan 31, 2024, 10:25 am

Blower Door Testing

NC-v4.1 EAc1: Enhanced Commissioning
posted by Cam Burkacki on Jan 31, 2024, 8:58 am

Hi all,

Very simple question here that I can't seem to find a straight answer on. Wondering whether blower door testing is a requirement for the envelope comissioning process, or whether...

GHG calculations ACP for Carbon offset

NC-v4 EAc7: Green power and carbon offsets
posted by Charline SEYTIER on Dec 4, 2017, 1:54 pm

Hi everyone

Has any of you used the http://www.ghgprotocol.org/calculation-tools to determine the quantity of mtCO2e needed to...

Last reply: Michaël Briffaz, Jan 31, 2024, 8:52 am

Easily Achievable Where Mandates are in Place

Pilot-Credits SSpc129: Comprehensive Composting
posted by Marsha Gentile on Jun 15, 2023, 4:29 pm

This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or...

Last reply: Mario Kranzl, Jan 31, 2024, 7:16 am

Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?

NC-v4.1 LTc5: Access to quality transit
posted by Zabdi Valdez on Mar 14, 2023, 6:01 pm

I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an...

Last reply: David O'Connell, Jan 31, 2024, 4:25 am