Topic

50% surface area reuse

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Mark Ragucci on Jan 15, 2020, 9:40 am

how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'. can i calculate...

Last reply: Stephani Carter, Mar 5, 2024, 7:34 pm

Backup Documentation

NC-v4 WEc4: Water metering
posted by Michelle Rosenberger on Mar 5, 2024, 11:09 am

is requested by the LEED Online credit template.  would be insterested to hear from others on this forum with respect to 'what to upload onto LO platform?'. good post! Log in or register to post...

Last reply: Karen Joslin, Mar 5, 2024, 12:27 pm

Building will be used by the client, not be leased to 3rd party. need of "tenant design & construction guidelines document"?

CS-2009 SSc9: Tenant Design and Construction Guidelines
posted by prudhvi mahadev on Feb 7, 2018, 1:03 am

hello,

im pursuing a project which is going with the rating LEED 2009 C&S. i have a question, in my case the owner himself will use the space for his own purpose and will not be leased...

Last reply: , Mar 5, 2024, 7:24 am

Consideration of Manmade Ponds in Protect or Restore Habitat Credit Calculations.

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Subhashkumar A on Mar 4, 2024, 12:42 pm

In one of our project, the site includes man-made ponds, which are used as rainwater storage ponds. For the calculation of the protect or restore habitat credit, can I include this pond area in...

Last reply: Bryna Dunn, Mar 4, 2024, 3:46 pm

Can properly designed rainwater ponds contribute to restored areas?

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Bryna Dunn on Feb 15, 2024, 12:55 pm

In a project that has both...

Last reply: Bryna Dunn, Mar 4, 2024, 1:44 pm

What is the Exact Definition of A Trip?

NC-v4 LTc5: Access to quality transit
posted by Krithikha Muthukrishnan on Nov 16, 2017, 5:19 am

I am posting this question largely because the credit langauage is not very clear(maybe language nativity issues here). In the Reference Guide, "A Trip" is defined as follows-

A trip...

Last reply: Shadi Abousamra, Mar 4, 2024, 9:29 am

Preheat coil requirement in baseline

NC-v4.1 EAp2: Minimum Energy Performance
posted by Samer Hassanie on Jan 31, 2024, 12:11 pm

Hi,

It is not clear from G3.1.3.19 where the preheat coil should be placed.

Is it upstream or downstream the economizer and the heat exchanger?

Last reply: Samer Hassanie, Mar 4, 2024, 6:50 am

Conflict of Interest

NC-v4 EAc1: Enhanced Commissioning
posted by Hameed Jasir on Mar 3, 2024, 2:22 am

Good morning.!

The owner hired ICA company for design and construction. Would it be acceptable for the contractor to hire the same company for LEED construction stage credit compliance and...

Off-street parking provided is less than minimum required spaces for EV-ready.

NC-v4.1 LTc8: Electric Vehicles
posted by Erica Downs on Oct 4, 2023, 6:20 pm

Thomas Lagarde LEEDuser Basic Member February 29, 2024- 4:47 pm How active is this forum? It seems this didn't get a lot of traction Log in or register to post comments Bryna Dunn Vice...

Last reply: Erica Downs, Mar 1, 2024, 10:52 am

No parking for the project

CI-v4 LTc5: Reduced parking footprint
posted by Ricardo Sá on Jan 9, 2017, 7:30 am

I understand that LEED v4 CI specifically states that "if there is existing parking associated with the project, it must comply with the requirements of the credit and show a percentage reduction...

Last reply: Thomas Lagarde, Feb 29, 2024, 4:51 pm