Topic | Recent |
---|---|
Site with no existing greenfieldCS-v4 SSc2: Site development - protect or restore habitatposted by Agustin Bertolotti on Mar 9, 2023, 9:01 am
Hi everyone We are working on a site which is previously developed with no existing... Last reply: Afogreen Build, Apr 1, 2024, 9:08 pm |
|
How can the MRp2 Plan be accredited in an existing building that you want to certify?CS-v4 MRp2: Construction and demolition waste management planningposted by Carlos Bueno on Feb 6, 2023, 12:54 pm
A potential existing building (with two years to go) now wants to be LEED certified. The client has provided us with all the information on the design and construction of the building, but we... Last reply: Afogreen Build, Apr 1, 2024, 9:05 pm |
|
Financial support for other organizationsPilot-Credits SSpc83: Offsite Financial Support for Habitat Protectionposted by Dan Ackerstein on Oct 16, 2017, 5:22 am
Is there precedent for achieving this credit with financial support for organizations other than NFWF or Amazonas Sustainable Foundation (FAS)? There are many well-respected land trusts making... Last reply: Jennifer Atherton, Apr 1, 2024, 4:42 pm |
|
Difficult Development Areas and Poverty Rate QualifiedCS-v4 LTc3: High priority siteposted by Hetvi Vora on Jun 14, 2023, 12:58 pm
Does a site that falls under the DDA areas need to be poverty rate qualified in order for me to achieve the priority designation credit under High Priority Site? Last reply: Afogreen Build, Apr 1, 2024, 2:59 am |
|
Deep Soil mixing activityNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Summer Gorder on Mar 29, 2024, 2:46 pm
Does deep soil mixing activity fall under 31.60 Foundations? |
|
Industrial or non-regular process loadNC-v4 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Nov 16, 2016, 8:52 am
For a facilities with increased process load (more than 60%), other than data centers, including but not limited to industrial facilities, is there a particular guidance in establishing a... Last reply: Abdullah Tahir, Mar 29, 2024, 1:40 am |
|
Parking spacesNC-v4 LTc7: Reduced parking footprintposted by David O'Connell on Mar 28, 2024, 5:13 am
Hi All, Working on a project that is part of larger campus it is only a single building that is being certified. There is a seperate parking lot where there is no plan on designing new... Last reply: Gioia Connell, Mar 28, 2024, 3:01 pm |
|
Exceptional calculation method application.NC-2009 EAp2: Minimum Energy Performanceposted by FABIO VIERO on Jun 8, 2015, 4:07 am
Under ASHRAE 90.1 – G2.5, can we avoid to use a workaround to detail a HVAC system feature which could involve an energy saving, therefore avoid to do an exceptional calculation method, if we... Last reply: Marcus Sheffer, Mar 28, 2024, 10:00 am |
|
Strategy #4- Filtration of Recirculated AirNC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Dave Hubka on Nov 22, 2021, 8:28 am
I wonder what... Last reply: Abdullah Tahir, Mar 28, 2024, 5:38 am |
|
Smoking Rules within construction project boundariesNC-v4 EQc3: Construction indoor air quality management planposted by Marine Petrosyan on Mar 28, 2024, 2:39 am
Hi, All! We are currently facing two major questions during the work with the construction project team. 1. How does LEED treat electronic cigarettes? Is it prohibited the same way... |