Topic | Recent |
---|---|
Light pollution reduction Existing site lightingNC-v4.1 SSc6: Light Pollution Reductionposted by Erik Heuler on Jun 26, 2024, 12:21 pm
Is existing site lighting, scheduled to remain, required to be included in the Light Pollution Reduction Credit when using the calculation method or is it only for proposed light fixtures? ...Last reply: Bill Swanson, Jul 1, 2024, 8:45 am |
|
"Enforcement" example / template languageNC-v4.1 EQp2: Environmental tobacco smoke controlposted by Joseph Snider on Nov 3, 2020, 5:27 pmof the no-smoking signage soon, and will post GBCI's comments to this forum once recieved. What peaks my interest is the "....as well as smoke produced from the combustion of cannabis..." language... Last reply: Dave Hubka, Jul 1, 2024, 8:14 am |
|
IAQp1 Compliance Method for Naturally Ventilated Rooms/Buildings in EuropeEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Chenlu Li on Feb 16, 2023, 4:43 am
Hi, We are currently working on few new and existing buildings in Ireland. These buildings have either natural ventilation or mixed ventilation (natural vent + mechanical vent) ... Last reply: Chenlu Li, Jul 1, 2024, 7:53 am |
|
Fresh Air RequirementEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Pulak Goyal on Nov 28, 2023, 4:10 am
I have an existing self storage warehouse to be certified under LEED v4.1 O+M Existing Buildings. It has no regular occupants and no regularly occupied spaces. Usually the storage spaces... Last reply: Catarina Costa Goncalves, Jul 1, 2024, 7:40 am |
|
Is drywall considered a demountable feature?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Andrea Tayah Esperão Malta de Campos on Jun 28, 2024, 11:39 am
I am working on a project for a commercial interior planning under ID+C certification that opted mainly for an open space plan but in certains areas there are some drywalls to convey privacy and... |
|
Kitchen Equipment- threshold for 1pt creditSchools-NC-v4.1 WEp2: Indoor water use reductionposted by Jeremy Theodore on Jun 28, 2024, 2:06 pm
We have a school in design achieving 40% to 45% reduction thus 4 to 5 points for Indoor Water Use Reduction per the LEED v4.1 guide. If it achieves at least 40% (antiicpated) it would then... |
|
Exemplary Performance for CSCS-v4.1 EAc5: Renewable energyposted by Sofia Barahona on Jun 27, 2024, 1:40 pm
What it the percentage of... Last reply: Sofia Barahona, Jun 28, 2024, 1:51 pm |
|
Building Product Disclosure and Optimization required documentationNC-v4.1 MRc4: Material Ingredientsposted by Marcelo Alencar Pereira on Jun 25, 2024, 2:28 pm
Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online? If we don... Last reply: Tommy Linstroth, Jun 28, 2024, 9:48 am |
|
Option 2 IAQ TestingNC-v4 EQc4: Indoor air quality assessmentposted by Robert Cashins on Nov 7, 2022, 12:18 pm
Are there guidelines on how to determine how many air samples need to be collected to comply with the... Last reply: Bipin Karki, Jun 26, 2024, 4:49 pm |
|
Are all spaces outside the 3x head height excluded?NC-v4.1 EQc8: Quality Viewsposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 10, 2024, 9:17 am
I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not... Last reply: Adam McCaughan, Jun 27, 2024, 12:23 pm |