Topic | Recent |
---|---|
Bird Collision Gradient Frit on glass panelNC-v4 INc1: Innovationposted by Thomas Lagarde on Jul 18, 2024, 10:55 am
Hello all ! As the title might suggest. How would you go at calculating the Bird Safety Factor for panels that have a gradient frit pattern on it ? Last reply: Jocelyn Calhoun, Jul 22, 2024, 5:41 am |
|
Option 2- Carbon dioxide monitoringNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Marina Curto on Mar 8, 2019, 5:32 am
We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered. Are we... Last reply: Mujib ur Rehman, Jul 21, 2024, 1:29 am |
|
VOC emission test performed on a different product in the same product lineCS-v4.1 EQc2: Low-emitting materialsposted by Erika Herrera on Jul 15, 2024, 3:26 pm
Hi LEED experts, I'm working on a project that intends to use a Sealant, which the manufacturer claims has been tested according to California Department of Public Health (CDPH) Standard... Last reply: Erika Herrera, Jul 19, 2024, 11:16 am |
|
TBLA Calculation of Cx SavingsPilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Candice Rogers on Apr 23, 2024, 10:15 pm
Hello - one of the newer features of Autocase is the calculation of... Last reply: Rachael Johnson, Jul 19, 2024, 10:58 am |
|
Office kitchen to be considered as regularly occupied space for Daylight AnalysisNC-v4 EQc7: Daylightposted by Rajat Kumar on Jul 19, 2024, 7:20 am
We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don |
|
BUS SERVICES PROVIDED BY SCHOOL TO MEET QUALITY TRANSIT REQUIREMENTSchools-NC-v4.1 LTc5: Access to quality transitposted by Amal Venugopal on Nov 3, 2022, 2:20 am
The query is for a school project which is in a location with no bus or any other mode of transporation within LEED proximity range , to meet the Quality transit credit, Opt1. Transit served... Last reply: , Jul 18, 2024, 11:08 am |
|
How to model process chilled water load?NC-v4 EAp2: Minimum Energy Performanceposted by Eric Dixon on Jul 15, 2024, 8:51 pm
My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller. The baseline system for this... Last reply: Tyler Thumma, Jul 18, 2024, 9:46 am |
|
Renewable Energy CalculatorNC-v4.1 EAc5: Renewable energyposted by Mike Halcom on Jul 27, 2020, 12:18 pm
We are contemplating changeing form LEED v4 to LEED v4.1 for... Last reply: Tyler Thumma, Jul 18, 2024, 9:16 am |
|
Baseline System 7 VAV- high Vot due to low EvzCS-v4 EAc2: Optimize Energy Performanceposted by Lenka Matějíčková on Jun 26, 2024, 8:14 am
Hi All, I would like to consult the derivation of the System Outdoor Air Intake (Vot) for baseline system 7... Last reply: Tyler Thumma, Jul 18, 2024, 9:05 am |
|
Regarding no refrigerant optionNC-v4 EAc6: Enhanced Refrigerant Managementposted by Nagaraj Sankar on Nov 1, 2023, 11:11 am
The project having spaces without cooling systems.In this case can we purchase no refrigerant option to achieve this credit. Last reply: Afogreen Build, Jul 17, 2024, 9:29 pm |