Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tenant space fan & pump sizing

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mike D  on 

We are a bit confused as to the meaning of space fan and pump sizing? Could anyone please offer some clarification? Thanks!

9
Default Avatar
LEEDuser Basic Member
45 thumbs up
Fri Mar 14, 2014, 3:16 pm

Dormitories - LEED NC?

LEED Rating System Selection
posted by  Maya Karkour  on 

Hi All, This international project consists of several 3 stories dormitories.

8
Fri Mar 14, 2014, 7:55 am

Air flow measurement for non densely occupied zones

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Magda Aghababyan  on 

Dear Sir/ Madam, I have a project that is a hotel with 200 guest rooms that are non-densely occupied. Each guest room floor (20 rooms per floor) is supplied with 3 AHUs.

6
Fri Mar 14, 2014, 3:47 am

Metering domestic hot water for kitchen - exemplary point in WEc

EBOM-2009 WEc1:Water Performance Measurement
posted by  Tom Kennedy  on 

Our project is a large office building with commercial kitchen (in house breakfast/lunch, etc).

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Fri Mar 14, 2014, 1:44 am

LEED Review clarification

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Craig Wilson  on 

Quick question that I’m hoping you can help me with. When you submit credits and LEED comes back with a review, is that the first and only review?

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Mar 13, 2014, 10:05 pm

Revisions to design submittal during CD submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  PATRICK HILLIER  on 

As part of my CD submittal response - that had corrections to my design submittal final - there were files that I was fairly certain I had uploaded but the response was "no new information was subm

6
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Mar 13, 2014, 3:37 pm

Exactly at silver - can you add points after construction final?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  PATRICK HILLIER  on 

Based on my CD review comments and current estimates I am exactly 50 points for silver (2009 NC). If in our final review we miss any points we will not make silver.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 13, 2014, 3:17 pm

ASHRAE forms for vrv systems

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

Our System is VRV , and the hvac Ashrae forms - part 1 and 2 - does not comply with vrv system - how we could comply with them and many of them does not comply with vrv system ???????????

3
Thu Mar 13, 2014, 2:29 pm

CO2 sensors in Residential Project

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ilana Judah  on 

We have a large residential project that has natural ventilation being used. Are CO2 sensors required in every room/bedroom of the apartments?

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Thu Mar 13, 2014, 2:16 pm

Using a newer version of 90.1 than what LEED specifies

NC-2009 EAp2:Minimum Energy Performance
posted by  Dave H  on 

I am working on a project that was registered under LEED NC 2.2. Will the USGBC allow us to apply requirements from 90.1 - 2010 to the project instead of 90.1 - 2004?

8
Default Avatar
LEEDuser Premium Member
19 thumbs up
Thu Mar 13, 2014, 1:22 pm