Appeal for design credits after construction phase
posted by soha yamani on
is it possible to appeal for denied design credit after submitting the construction stage credits and receiving the preliminary construction review ?
ADA showerhead
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Lisa Marshall on
Our project has 2 out of 10 shower stalls that are considered ADA shower stalls.
changes to Regional Priority credits
NC-2009 RPc1:Regional Priorityposted by Devani PERERA on
The credits available for regional priorities on the link above and the credits available on LEEDonline do not tally for my project.
EZ
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Cheryl Burkinshaw on
I am working on a small project with a design team that is fairly new to LEED.
Electric Shower
NC-2009 EAp2:Minimum Energy Performanceposted by SW LEE on
Our project is at South East Asia, do we need to comply to ASHRAE 90.1 on electric shower?
LEED Exam question
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Farah A. on
A new office project will have 200 employees and anticipates an estimated 30/visitors a day. During peak periods, the building will be occupied by 210 occupants.
SSp1 / ESC plan and the Multi-Building Campus Guidance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Laura Billings on
Hi there - I'm working on a 4-building office campus that is being developed all in one phase.
T2, T4, T6
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Gustavo De las Heras Izquierdo on
This credit does not allow installing T9, T10 or T12 fluorescent lamps. This credit provides a criteria to specify T5 and T8 fluorescent lamps. Are there any requirement for T2, T4 and T6 fluores
Mech. exhaust fans required for a naturally ventilated project?
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.
LEED CI 2009 M&V metering requirements
CI-2009 EAc3:Measurement and Verificationposted by Patrick Salmon on
Our company is in the process of determining whether a commercial interiors project is ideal for the EAc3 submetering option for Case 1.