Task Lighting included?
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by BEE Incorporations on
Hi, We are working on an office project outside the US and recommending the client install desk lamps as task lighting to increase controllability of lighting and reduce ceiling lighting energy l
Guestrooms Excluded?
posted by Ellen Mitchell on
Why are guestrooms excluded? It seems they should be in the same realm as dorm rooms or bedrooms.
Filtrations on milan wall
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael E. Edmonds-Bauer on
We were asked by a contractor about a project where the milan wall (structural soil estabilization) is having some water filtrations. The product will be applied on a milan wall (concrete wall) th
App G Baseline HVAC Zones
NC-2009 EAc1:Optimize Energy Performanceposted by Victoria Watson on
Hi, I am working on a large building which is part theater, part convention center and part exhibitions halls + ancillary spaces. The baseline system is system type 7.
Playing fields exclusion
NC-2009 WEc1:Water Efficient Landscapingposted by FRAGKISKOS LEVANTIS on
Projects other than Schools: Can they exclude playing fields in certain credits just like Schools can?
Submetering for AHUs with multiple tanents
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Jatuwat Varodompun on
We have an hi-rise office building with Chiller and AHUs system. We plan to 3 AHUs per floor. 1.
Future space
CS-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
In case of project with an area which is already designed but yet built (less than 40% of gross project area), can we use "owner's commitment" instead of "leasing agreement" to state all the design
Building with no parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by John Riker on
I am working on an existing building in a commercial core. The building has no parking lot, but there is leasable parking spots in the vicinity.
Fundamental commissioning of the base building
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by eileen hughes on
General Contractor is working on the base building, which is required to be LEED CS certified.
Education Program - what if project is private?
NC-2009 IDc1:Innovation in Designposted by Crista Shopis on
The nature of my clients building is private. They would be unwilling to host tours from the public or include too much information on a public website.