Task Lighting included?

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  BEE Incorporations  on 

Hi, We are working on an office project outside the US and recommending the client install desk lamps as task lighting to increase controllability of lighting and reduce ceiling lighting energy l

3
Thu Mar 27, 2014, 6:53 am

Guestrooms Excluded?

General forums
posted by  Ellen Mitchell  on 

Why are guestrooms excluded? It seems they should be in the same realm as dorm rooms or bedrooms.

5
Architect
Duket Architects Planners
LEEDuser Basic Member
74 thumbs up
Wed Mar 26, 2014, 10:29 pm

Filtrations on milan wall

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michael E. Edmonds-Bauer  on 

We were asked by a contractor about a project where the milan wall (structural soil estabilization) is having some water filtrations. The product will be applied on a milan wall (concrete wall) th

2
Wed Mar 26, 2014, 10:20 pm

App G Baseline HVAC Zones

NC-2009 EAc1:Optimize Energy Performance
posted by  Victoria Watson  on 

Hi, I am working on a large building which is part theater, part convention center and part exhibitions halls + ancillary spaces. The baseline system is system type 7.

3
Wed Mar 26, 2014, 8:45 pm

Playing fields exclusion

NC-2009 WEc1:Water Efficient Landscaping
posted by  FRAGKISKOS LEVANTIS  on 

Projects other than Schools: Can they exclude playing fields in certain credits just like Schools can?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 26, 2014, 7:56 pm

Submetering for AHUs with multiple tanents

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Jatuwat Varodompun  on 

We have an hi-rise office building with Chiller and AHUs system. We plan to 3 AHUs per floor. 1.

5
Wed Mar 26, 2014, 1:00 pm

Future space

CS-2009 EAc1:Optimize Energy Performance
posted by  Jatuwat Varodompun  on 

In case of project with an area which is already designed but yet built (less than 40% of gross project area), can we use "owner's commitment" instead of "leasing agreement" to state all the design

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 26, 2014, 6:21 am

Building with no parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  John Riker  on 

I am working on an existing building in a commercial core. The building has no parking lot, but there is leasable parking spots in the vicinity.

3
Tue Mar 25, 2014, 11:20 pm

Fundamental commissioning of the base building

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  eileen hughes  on 

General Contractor is working on the base building, which is required to be LEED CS certified.

3
Regional Director
Integral Group
LEEDuser Basic Member
0 thumbs up
Tue Mar 25, 2014, 8:17 pm

Education Program - what if project is private?

NC-2009 IDc1:Innovation in Design
posted by  Crista Shopis  on 

The nature of my clients building is private. They would be unwilling to host tours from the public or include too much information on a public website.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Mar 25, 2014, 7:52 pm