1-year and 2-year 24-hour Design Storm
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Liubov Melnikova on
Michael DeVuono, I've digged through both forum 6.1 and 6.2 but didn't found international data for Design Storm. I am doing a project in Russia.
Lighting controls
NC-2009 EAc1:Optimize Energy Performanceposted by Isabel Santos on
Dear all, I am trying to model the use of two daylight controls in an industrial storage building with few windows and skylights with only 20% of transmittance.
Stall count: Vehicles vs. Mopeds
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Keith Steurer on
For a project at a University, we are providing 102 parking spaces for cars and 50 spaces for mopeds.
Commissioning stand-by energy sources
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Maya Karkour on
Dear All, Do stand-by electricity generators need to be commissioned as part of this prerequisite?
CO2 sensors located in the return duct
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Katie Raymond on
I noticed Ben's comment below from February 10th, "Also, if the CO2 sensors are located in the return duct, the review team will likely request justification for how those sensors are accurately a
Dormitory / Mixed Use Project
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Cassandra Coffin on
I am working on a new residence hall for a University in which the lower two floors consist of offices, a large multi-purpose room, a seminar room, a learning commons center, a cafe and custodial/m
Building Area vs Space-by-Space method
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Brian Coldwell on
We are working on a LEED-CI project in a large commercial office building, where the overall 'building area' method would clearly be office at 1 W/sf.
Self-contained classroom pods = regularly used entrances?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Joyce Kelly on
Picture a University bldg. shaped to form a slot canyon to provide shaded access to the outdoors. Within the canyon, which includes doors to exit the courtyard, are a few small classroom pods.
Cruise Terminal FTE and Visitor/Transient count
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Sheryl Swartzle on
Our cruise terminal has a season from October 1 to April 15 when the FTE will be 155 and visitor/transient will be 2,000 per day for 3 or 4 days per week (the other 3-4 days per week it would drop
SSc4.2 / WEc3
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Bryan Pratt on
I am working on an expansion to an existing building that will be using existing plumbing fixtures to satisfy requirementst.