Forum quick links
Waste Audit - Averaging?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Nate Gillette on
Hello: the property has been tracking recyclables since 2011 in support of their ISO14001 program. So I have monthly data going back since Jan 2011. A 24-hour period does not make sense to them.
Laundry Detergent
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Nate Gillette on
While I recognize that laundry detergent is not part of this credit, I see a comment in this thread stating that you could make a case to add it.
Maximum points for Innovation in Design
NC-2009 IDc1:Innovation in Designposted by Tim Crowley on
I'm working on a project in which we have already been awarded (2) points for Exemplary Performance + another (2) points for Innovation in Design (for a green housekeeping plan as well as a radon m
Option 2, path 1 - 50% reduction of total water applied
NC-2009 WEc1:Water Efficient Landscapingposted by Lise Dannesboe on
HI! We would like to pursue Option 2, path 1 and dimension the rainwater tank for supplying 100% of the irrigation needs.
Fresh air provided by transfer grill
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Dear all, I am consulting on a big project which has small electrical rooms (~30 sq.ft) in the mechanically ventilated parking basement.
Using the Assembly Calculator for Gyp Wall assemblies
CI-2009 MRc4:Recycled Contentposted by Charles Nepps on
I know this is kind of out there, but we have a situation where the GC has only provided unit pricing for wall assemblies (per sf) and not a cost breakdown of the individual components.
Roof Anchors
NC-2009 MRc4:Recycled Contentposted by MT A on
Roof anchors are permanently installed - can they be included in the calculations? I've seen them specified in Division 7 under roofing, Division 11, and perhaps can bu under Division 10.
Shower location
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by K Nakamura on
The 200 yard rule applies to bicycle racks outside of the project boundary but how about public showers outside of the project boundary?
AHU in IT Room
CI-2009 IEQp1:Minimum IAQ Performanceposted by Silvia Ruiz on
Hi, I have two short questions: 1. Would an IT Room require a minimum ventilation rate if it is an infrequently occupied space?
EQc3, EQc5 and filtration requirements
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Steve Loppnow on
I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.